Welding zone | Minimum air flow cubic feet/minutes | Duct diameter inches |
4 to 6 inches from arc or torch | 150 | 3 |
6 to 8 inches from arc or torch | 275 | 3-1/2 |
8 to 10 inches from arc or torch | 425 | 4-1/2 |
10 to 12 inches from arc or torch | 600 | 5-1/2 |
1 | When brazing with cadmium bearing materials or when cutting on such materials increased rates of ventilation may be required. |
2 | Nearest half-inch duct diameter based on 4,000 feet per minute velocity in pipe. |
(2) A fixed enclosure with a top and at least two sides that surround the welding or cutting operations and with a rate of airflow sufficient to maintain a velocity away from the welder of not less than 100 linear feet per minute.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050, and
49.17.060. WSR 20-21-091, § 296-307-50015, filed 10/20/20, effective 11/20/20. WSR 97-09-013, recodified as § 296-307-50015, filed 4/7/97, effective 4/7/97. Statutory Authority: RCW
49.17.040, [49.17.]050 and [49.17.]060. WSR 96-22-048, § 296-306A-50015, filed 10/31/96, effective 12/1/96.]