(1) If a plumbing contractor changes its business structure (for example, from a partnership to a corporation or if the partners in a partnership change or change in the designated plumber that changes the scope of work that can be performed), the plumbing contractor must:
(a) Apply for a new plumbing license as required in WAC
296-400A-011; and
(2) If a plumbing contractor changes its designated plumber without a change in the scope of work that can be performed, the plumbing contractor must:
(a) Submit a new designated plumber form as required in WAC
296-400A-011.
(b) Pay the change designated plumber fee shown in WAC
296-400A-045.
(3) Failure to relicense after a change in business structure may invalidate the plumbing contractor's license. See RCW
18.106.410.
(4) If a licensed plumbing contractor changes its name, it must:
(a) Notify the department, in writing, of the change; and
(c) Submit to the department a name change rider or a new bond in the new name and a certificate of insurance in the new name.
(5) If a licensed plumbing contractor changes its address, it must notify the department in writing.
[Statutory Authority: 2020 c 153. WSR 21-13-041, § 296-400A-015, filed 6/10/21, effective 7/1/21.]