You must make sure energy-isolating devices designed to accept a lockout device are provided on machines and equipment that:
(1) Are newly installed; or
(2) Have undergone major replacement, repair, renovation, or modification after July 2, 1990.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050, and
49.17.060. WSR 17-18-075, § 296-803-30005, filed 9/5/17, effective 10/6/17; WSR 09-16-108, § 296-803-30005, filed 8/4/09, effective 11/1/09; WSR 04-15-105, § 296-803-30005, filed 7/20/04, effective 11/1/04.]