Exemption: | Energy control procedures used less frequently than once a year only need to be reviewed before being used. |
(2) You must have the periodic review done by an authorized employee other than the ones using the energy control procedure being reviewed.
(3) You must document that periodic reviews have been done.
Include all of the following:
(a) Machine or equipment the energy control procedure was used for.
(b) Date of the review.
(c) Employees included in the review.
(d) Person doing the review.