Figure D-6 - Step Bolt Spacing
(6) Each step bolt installed before October 1, 2020, is capable of supporting its maximum intended load.
(7) Each step bolt installed on or after October 1, 2020, is capable of supporting at least four times its maximum intended load.
(8) Each step bolt is inspected at the start of the work shift and maintained in accordance with the walking-working surface rule (WAC
296-24-73505).
(9) Each step bolt installed before October 1, 2020, is capable of supporting its maximum intended load.
(10) Each step bolt installed on or after October 1, 2020, is capable of supporting at least four times its maximum intended load.
(11) Each step bolt is inspected at the start of the work shift and maintained in accordance with the walking-working surface rule (WAC
296-24-73505).