PDFWAC 357-31-280

How long can operations be suspended?

The period of suspended operations must not exceed fifteen calendar days without director approval.
[Statutory Authority: Chapter 41.06 RCW. WSR 05-08-137, § 357-31-280, filed 4/6/05, effective 7/1/05.]