PDFWAC 392-900-050

Construction cost allocation (CCA).

The eligible construction cost in the STEM grant program shall be calculated by multiplying the approved square foot area of the projects as set forth in WAC 392-900-040 by the construction cost allocation as set forth in WAC 392-343-060.
[Statutory Authority: RCW 28A.525.020. WSR 16-20-056, § 392-900-050, filed 9/30/16, effective 10/31/16.]