(a) | Category I base fees for one connection. |
(i) | Field (agricultural), forest lands, utility operation and maintenance . . . . | $50 |
(ii) | Residential dwelling units (up to 10) utilizing a single connection point . . . . | $50 |
per dwelling unit |
(iii) | Other, with 100 AWDVTE or less . . . . | $500 |
(iv) | Fee per additional connection point . . . . | $50 |
(b) | Category II base fees for one connection. |
(i) | Less than 1,000 AWDVTE . . . . | $1,000 |
(ii) | 1,000 to 1,500 AWDVTE . . . . | $1,500 |
(iii) | Fee per additional connection point . . . . | $250 |
(c) | Category III base fees for one connection. |
(i) | 1,500 to 2,500 AWDVTE . . . . | $2,500 |
(ii) | Over 2,500 AWDVTE . . . . | $4,000 |
(iii) | Fee per additional connection point . . . . | $1,000 |
(d) | Category IV base fee per connection . . . . | $100 |
(2) Surety bond. Prior to the beginning of construction of any connection, the department may require the permit holder to provide a surety bond as specified in WAC
468-34-020(3).
[Statutory Authority: Chapter
47.50 RCW. WSR 99-06-034 (Order 187), § 468-51-070, filed 2/25/99, effective 3/28/99. Statutory Authority: RCW
47.01.101 and chapter
47.50 RCW. WSR 92-14-044, § 468-51-070, filed 6/24/92, effective 7/25/92.]