Any cemetery authority selling undeveloped graves, unconstructed crypts or niches in accordance with chapter
68.46 RCW must make available to the purchaser at the time the prearrangement contract is signed.
• A statement of estimated time schedule of the development or construction.
Estimated time schedule must:
• Be submitted to the cemetery board annually with the financial reports required by RCW
68.46.090.
• Be made available to holders of prearrangement contracts affected by the development or construction in the offices of the cemetery authority.
A cemetery authority must maintain an equivalent inventory of constructed crypts, niches and developed graves, equal to ten percent of the unconstructed crypts, niches and undeveloped graves sold through prearrangement contracts. The equivalent inventory must be located within the cemetery or an adjacent cemetery under common ownership.
Trust fund deposits required for the prearrangement contract sales of undeveloped property, will be in accordance with RCW
68.46.030.
[Statutory Authority: RCW
68.05.105 and chapter
34.05 RCW. WSR 07-11-088, § 98-14-080, filed 5/15/07, effective 6/15/07. Statutory Authority: RCW
68.05.100. WSR 02-19-018, § 98-14-080, filed 9/9/02, effective 10/10/02; WSR 83-02-063 (Order 106), § 98-14-080, filed 1/5/83.]