On-site work or equipment installation work which falls within the scope of installation as set forth in RCW
43.22A.010(6) shall not be performed on a manufactured home at any time after the initial installation of a manufactured home without the supervision of a certified manufactured home installer.
On-site work and equipment installation work shall not be performed until a permit for such work has been issued by the local enforcement agency. On-site work and equipment installation work must be inspected upon completion by the local enforcement agency in the same manner initial home installations are inspected.
On-site work and equipment installation work include, but are not limited to:
(1) Releveling a home such as installing all new pier blocks or footings;
(2) Complete skirting replacement;
(3) Installing earthquake resistant bracing systems; and
(4) Any other work described in RCW
43.22A.010(6).
On-site work and equipment installation work does not include routine maintenance or other routine repairs such as periodic adjustments to piers, replacement of a damaged pier, or skirting repair.
[Statutory Authority: Chapter
43.22A RCW and 2007 c 432. WSR 08-12-040, § 296-150I-0100, filed 5/30/08, effective 6/30/08.]