PDFWAC 480-107-065

Eligibility for long-run conservation purchase rates.

(1) Any conservation supplier may participate in the bidding process. A utility may allow a utility subsidiary to participate as a conservation supplier, on conditions described in WAC 480-107-135 Conditions for purchase of electrical power or savings from a utility's subsidiary or affiliate. A decision to allow a utility subsidiary to participate must be explained in the utility's RFP submittal.
(2) All conservation measures included in a project proposal must:
(a) Produce electrical savings over a time period greater than five years, or a longer period if specified in the utility's RFP. A measure with an expected life that is shorter than the contract term must include replacements through the contract term;
(b) Be consistent with the utility's integrated resource plan; and
(c) Produce savings that can be reliably measured or estimated with accepted engineering methods.
[Statutory Authority: RCW 80.01.040 and 80.04.160. WSR 06-08-025 (Docket No. UE-030423, General Order No. R-530), § 480-107-065, filed 3/28/06, effective 4/28/06.]