Building Status | Application | Qualifications |
New building | Air-handling system and all zones served by the system | All air-handling systems in buildings with building cooling capacity greater than 780,000 Btu/h |
Air-handling system and all zones served by the system | Individual systems supplying more than three zones and with fan system bhp of 10 hp and larger |
Chilled-water plant and all coils and terminal units served by the system | Individual plants supplying more than three zones and with design cooling capacity of 300,000 Btu/h and larger |
Hot-water plant and all coils and terminal units served by the system | Individual plants supplying more than three zones and with design heating capacity of 300,000 Btu/h and larger |
Alteration or addition | Zone terminal unit such as VAV box | Where existing zones served by the same air-handling, chilled-water, or hot-water system have DDC |
Air-handling system or fan coil | Where existing air-handling system(s) and fan coil(s) served by the same chilled- or hot-water plant have DDC |
New air-handling system and all new zones served by the system | Individual systems with fan system bhp of 10 hp and larger and supplying more than three zones and more than 75 percent of zones are new |
New or upgraded chilled-water plant | Where all chillers are new and plant design cooling capacity is 300,000 Btu/h and larger |