PDFWAC 51-11C-408012

Figure C408.1.4.1Commissioning compliance checklist.

Figure C408.1.4.1
Commissioning Compliance Checklist
 
Project Name:
Project Information
Project Address:
 
Certified Commissioning Professional:
 
Type of ISO Certification and Number:
Supporting
Documents
Manuals, record documents and training have been completed or are scheduled (Section C103.6)
 
 
Building operations and maintenance information (C103.6.2) have been submitted to the owner or scheduled date:
 
 
Manuals (C103.6.2.1) have been submitted to the owner or scheduled date:
 
 
Compliance documentation (C103.6.3) has been provided to the owner or scheduled date:
 
 
System operation training (C103.6.4) has been provided to the owner or scheduled date:
Commissioning Plan
Commissioning Plan was used during construction (Section C408.1.2)
Commissioning Report
Commissioning Report has been submitted (Section C408.1.3)
Commissioned Systems
Mechanical Systems were included in the commissioning process (Section C408.2)
 
 
Testing, adjusting and balancing is complete (Section C408.2.2).
 
 
There are unresolved deficiencies with the mechanical systems. These are described in the attached Commissioning Report submitted to the owner.
 
Service Water Heating Systems were included in the commissioning process (Section C408.3)
 
 
There are unresolved deficiencies with the service water heating systems. These are described in the attached Commissioning Report submitted to the owner.
 
Controlled receptacles and lighting control systems were included in the commissioning process (Section C408.4)
 
 
There are unresolved deficiencies with the electrical power and/or automatic lighting controls. These are described in the attached Commissioning Report submitted to the owner.
 
Additional Systems included in the commissioning process (Section C408.5)
 
 
There are unresolved deficiencies with systems required by Section C406 or Section C407. These are described in the attached Commissioning Report submitted to the owner.
 
Metering Systems were included in the commissioning process (Section C408.6)
 
 
There are unresolved deficiencies with the metering system. These are described in the attached Commissioning Report submitted to the owner.
 
Refrigeration Systems were included in the commissioning process (Section C408.7)
 
 
There are unresolved deficiencies with the systems required by Section C410. These are described in the attached Commissioning Report submitted to the owner.
Certification
I hereby certify that all requirements for Section C408 System Commissioning have been completed in accordance with the Washington State Energy Code, including all items above.
 
 
 
 
 
 
 
 
Certified Commissioning Professional
Date
 
I hereby certify that all requirements for Section C408 System Commissioning have been completed in accordance with the Washington State Energy Code, including all items above.
 
 
 
 
 
 
 
 
Building Owner or Owner's Authorized Agent
Date
[Statutory Authority: RCW 19.27A.020, 19.27A.025, 19.27A.160 and chapter 19.27 RCW. WSR 19-24-040, § 51-11C-408012, filed 11/26/19, effective 7/1/20. Statutory Authority: RCW 19.27A.025, 19.27A.160, and 19.27.074. WSR 16-03-072, § 51-11C-408012, filed 1/19/16, effective 7/1/16. Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. WSR 13-04-056, § 51-11C-408012, filed 2/1/13, effective 7/1/13.]