Ecology finds that the public interest advanced by future withdrawals for environmental restoration projects (ERPs), as defined and conditioned in this section, clearly overrides the minimal negative impacts on instream flows.
(1) Ecology may approve a future withdrawal for an ERP only if it meets all the following:
(a) The proposed water use is for a bypass flow for salmonid habitat restoration, or for riparian planting, and the primary purpose of the project is restoration of salmonids;
(b) The proposed project will result in aquatic habitat benefits, and such benefits will exceed any detriment to aquatic habitat that may be caused by reductions in flow at specific locations and times of withdrawal; and
(c) The proposed use qualifies for a temporary permit.
(2) Ecology, in consultation with the department of fish and wildlife and tribes, will evaluate proposed ERPs. ERPs approved by ecology are not subject to closures or instream flows set in this chapter, unless otherwise conditioned by the permit.
[Statutory Authority: Chapters
90.54, 90.22, 90.82, 90.03, and
90.44 RCW. WSR 09-24-080 (Order 04-02), § 173-517-200, filed 11/30/09, effective 12/31/09.]