(Effective January 1, 2024)

PDFWAC 16-662-200

Electric vehicle supply equipment compliance dates.

(1) Any publicly available electric vehicle supply equipment, including both level 2 and direct current fast chargers, installed and placed into service before January 1, 2024, is exempt from the requirements in WAC 16-662-210 through 16-662-220 until January 1, 2034. Equipment that is replaced or retrofitted with new hardware on or after January 1, 2024, is considered to have been installed and placed into service after January 1, 2024, and must comply with the requirements in WAC 16-662-210 through 16-662-220 upon installation.
(2) Publicly available electric vehicle supply equipment that is exempt as described in subsection (1) of this section must be clearly marked with the date of installation in a conspicuous location that is easily seen during normal use by the public. Acceptable ways to clearly mark the installation date may include:
(a) A sign, sticker, or plaque; or
(b) Any other visible marker that is readable, such as a digital display showing the installation date on the home screen or through a menu that is intuitive, making the installation date easily identified.
(c) When dates are located on a kiosk, the installation date of each electric vehicle supply equipment serviced by that kiosk shall be clearly identified.
(3) If the installation date is not clearly marked, the device will be considered to have been installed and placed into service after January 1, 2024, and will be subject to the requirements in WAC 16-662-210 through 16-662-220.
[Statutory Authority: 2021 c 238, RCW 19.94.010, 19.94.190, 19.94.555, 19.94.565, 19.94.570, and 19.94.575. WSR 23-01-091, § 16-662-200, filed 12/16/22, effective 1/1/24.]