PDF
WAC 132N-150-210
Temporary structures.
The erection of tents, awnings, canopies, or similar structures must be cleared with the security/safety office.
[Statutory Authority: RCW
28B.50.140
. WSR 02-04-068, § 132N-150-210, filed 1/31/02, effective 3/3/02.]