PDFWAC 136-20-040

Certification.

Prior to April 1st of each calendar year, the WSDOT director of local programs will provide the following to the county road administration board:
(1) A listing on a county-by-county basis of all county NBI bridges which have not had a regular WSBIS and bridge inspection report submitted within the previous thirty months; and
(2) A listing on a county-by-county basis of all county NBI bridges which have not had a required special inspection report submitted within six months after the required inspection date; and
(3) A listing of all counties which are not in compliance with the requirements of the National Bridge Inspection Standards and the status of efforts toward achieving such compliance.
Any county which is not in compliance with the NBIS or has a bridge or bridges on any of the above listings shall be assumed to be not in compliance with bridge inspection procedures.
[Statutory Authority: Chapter 36.78 RCW. WSR 14-17-035, § 136-20-040, filed 8/13/14, effective 9/13/14. Statutory Authority: Chapter 36.79 RCW. WSR 99-01-021, § 136-20-040, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. WSR 96-17-013, § 136-20-040, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.78.070. WSR 91-21-136 (Order 83), § 136-20-040, filed 10/23/91, effective 11/23/91; WSR 90-17-075 (Order 78), § 136-20-040, filed 8/16/90, effective 9/16/90. Statutory Authority: Chapter 36.78 RCW. WSR 79-01-099 (Order 36), § 136-20-040, filed 1/3/79; Order 22, § 136-20-040, filed 4/19/73; Order 11, § 136-20-040, filed 10/9/69.]