In the event that any of the designations set forth in this chapter or a shoreline master program approved under WAC
173-18-044, conflict with the criteria set forth in RCW
90.58.030(2) or in WAC
173-18-040 the criteria shall control. The designation of the stream or river shall be governed by the criteria, except that the local government must amend the local master program to reflect the new designation within three years of the discovery of the discrepancy.