Within one hundred twenty days following completion of construction or modification of a dam, the project engineer, as representative of the owner, shall submit a report to the department on construction activities which includes:
(1) A summary of results from field testing of materials used in construction. The summary shall identify both representative values and the range of test values;
(2) A discussion of any notable items encountered during construction;
(3) One complete set of drawings describing the as-built condition of the dam. These drawings shall be submitted in both paper and electronic format.
[Statutory Authority: RCW
43.21A.064,
43.21A.080,
86.16.061,
90.03.350 and [90.03].470. WSR 04-16-122 (Order 03-08), § 173-175-250, filed 8/4/04, effective 9/4/04. Statutory Authority: RCW
43.21A.064, [43.21A.]080 and
86.16.061. WSR 92-12-055 (Order 91-17), § 173-175-250, filed 6/1/92, effective 7/2/92.]