PDFWAC 173-180-425

Class 1 facility—Operations manual submittal.

(1) The owner or operator of an existing facility must submit the operations manual to ecology within one hundred twenty calendar days from the effective date of this chapter.
(a) Existing Class 1 facilities that have an ecology approved operations manual, on the date this chapter becomes effective, may submit only the new changes to the operations manual instead of resubmitting the entire operations manual.
(b) For Class 1 facilities that begin operations after the effective date of this chapter, the owner or operator must submit an operations manual to ecology at least one hundred twenty calendar days prior to conducting an oil transfer operation.
(2) One paper and one electronic copy of the operations manual and appendices must be delivered to:
The Department of Ecology
Spill Prevention, Preparedness, and Response Program
Operations Manual
P.O. Box 47600
Olympia, WA 98504-7600
Or
The Department of Ecology
Spill Prevention, Preparedness, and Response Program
Operations Manual
300 Desmond Drive
Lacey, WA 98503
(3) The operations manual submitter may request that proprietary information be kept confidential under RCW 43.21A.160.
[Statutory Authority: RCW 88.46.160, 88.46.165, and chapter 90.56 RCW. WSR 06-20-034 (Order 06-02), § 173-180-425, filed 9/25/06, effective 10/26/06.]