Type of Drill | Drill Expectations and Duration |
Deployment drills | These drills may involve testing whether or not the facility can deploy personnel, boom, recovery, and storage equipment as described in WAC 173-180-222. |
Notification and emergency shutdown procedure drills | These drills may involve testing the facility's ability to follow the notification in the response plan and emergency shutdown procedures described in the operations manual. |
[Statutory Authority: RCW
88.46.160,
88.46.165, and chapter
90.56 RCW. WSR 06-20-034 (Order 06-02), § 173-180-810, filed 9/25/06, effective 10/26/06.]