(1) Approved construction plans and specifications. Construction plans and specifications must be submitted to the lead agency for review and approval prior to construction of the facility. The generator must submit:
(a) Two complete sets of paper plans and specifications, and one complete set in an electronic format for approval as allowed by the lead agency. The lead agency may waive the requirement for paper submittals.
(b) Construction plan and specifications meeting lead agency guidance and standards.
Once the lead agency determines that the final design documents are acceptable, it will stamp one of the paper copies of the final plans "approved" and return them to the generator for their records.
(2) Content of construction document. The construction document must:
(a) Include a list of the design criteria for each unit process and for the overall facility.
(b) Include a field-commissioning plan for new facilities, if applicable. The plan must include testing of all processes, equipment, and reactors used in the generation of reclaimed water and be consistent with the review standards provided in WAC
173-219-200.
(c) Include a plan for interim operation of facilities during construction, if applicable.
(d) Comply with WAC
173-219-310 and identify all potential cross-connections, and the device or assembly to be installed to prevent them, as described in WAC
173-219-310. This information must also be included in the as-built drawings and final operations and maintenance manual under WAC
173-219-240.
(e) Follow applicable requirements in:
(i) WAC
173-240-070 for domestic wastewater facilities.
[Statutory Authority: RCW
90.46.015. WSR 18-03-166 (Order 06-12), § 173-219-220, filed 1/23/18, effective 2/23/18.]