The state, in consultation with regional state and utility contacts, will determine if curtailment is required, and if so, the appropriate initial stage. It is the intent of the state to initiate statewide curtailment concurrent with Oregon, Idaho, and Montana, leading to an effective regional curtailment and consistent implementation policies. The state will formally notify the utility coordinator and all electric utilities operating within the state of Washington that regional and statewide electric load curtailment are in effect. If any stage associated with a specific level of curtailment is declared (Stages 2-5), the state will publicly announce the need for curtailment and provide all utilities operating within the state of Washington with written instructions regarding utility obligations during the period of state-initiated load curtailment. Upon notification by the state, utilities shall immediately initiate curtailment on their own systems in conformance with this plan.
[Statutory Authority: RCW
43.21F.045. WSR 94-20-103, § 194-22-040, filed 10/4/94, effective 11/4/94.]