Lake Name and Water Resource Inventory Area ((WRIA) in parentheses) | Authorized Work Times |
Baker (04) | June 15 - August 15 |
Cle Elum (39) | September 1 - March 31 |
Osoyoos (49) | May 15 - September 30 |
Ozette (20) | August 1 - October 31 |
Pleasant (20) | August 1 - October 31 |
Sammamish (08) | July 15 - September 30 |
Washington (08) | July 15 - September 30 |
(j) Installing, maintaining, or removing scientific measurement devices if:
(i) All work conducted waterward of the OHWL is done by hand or with hand-held tools;
(ii) The project does not create a blockage to fish passage, even temporarily; and
(iii) The project does not include dewatering the job site, placing fill or concrete, or excavating or grading the bed or bank.
(k) Forest practices hydraulic projects, as defined in chapter
76.09 RCW and governed in Title 222 WAC; and
(l) Installation or maintenance of tideland and floating private sector commercial fish and shellfish culture facilities (RCW
77.12.047). However, an HPA is required to construct accessory hydraulic structures, such as bulkheads or boat ramps.