(1) In addition to the reporting requirements in chapters
246-220 through
246-254 WAC, the licensee shall report the following events if not reported under chapters
246-220 through
246-254 WAC:
(a) Source stuck in an unshielded position.
(b) Any fire or explosion in a radiation room.
(c) Damage to the source racks.
(d) Failure of the cable or drive mechanism used to move the source racks.
(e) Inoperability of the access control system.
(f) Detection of radiation source by the product exit monitor.
(g) Detection of radioactive contamination attributable to licensed radioactive material.
(h) Structural damage to the pool liner or walls.
(i) Abnormal water loss or leakage from the source storage pool.
(j) Pool water conductivity exceeding one hundred microsiemens per centimeter.
(2) The report must include a telephone report within twenty-four hours as described in WAC 246-221-250, and a written report within thirty days as described in WAC 246-221-250.
[Statutory Authority: RCW
70.98.050,
70.98.110 and 58 F.R. 7728, 76 F.R. 56963, 77 F.R. 39906, 80 F.R. 54234. WSR 18-15-017, § 246-236-083, filed 7/9/18, effective 8/9/18.]