(1) A purveyor shall designate at least one certified operator in responsible charge to meet the requirements of WAC
246-292-032 and as required in WAC
246-292-050 (1), (2), and (4), as applicable.
(2) A purveyor may designate additional certified operators in responsible charge in accordance with WAC
246-292-050(3) when a purveyor has designated operating shifts and major segments.
(3) A purveyor shall designate and report mandatory certified operators in responsible charge positions to the department within thirty days of:
(a) Starting operations of a public water system; or
(b) When a mandatory certified operator in responsible charge position is vacated.
(4) The purveyor shall not require certified operators to perform an action or correction that is inconsistent with their experience, skills, abilities, or level of certification.
[Statutory Authority: RCW
70.119.050 and chapter
70.119 RCW. WSR 14-01-003, § 246-292-020, filed 12/4/13, effective 1/4/14. Statutory Authority: Chapter
70.119 RCW and Safe Drinking Water Act, Public Law 104-182; 64 F.R. 5916 - 5921. WSR 01-02-070, § 246-292-020, filed 12/29/00, effective 1/29/01. Statutory Authority: Chapter
70.119 RCW. WSR 94-04-004, § 246-292-020, filed 1/20/94, effective 2/20/94. Statutory Authority: RCW
43.70.040. WSR 91-02-049 (Order 121), recodified as § 246-292-020, filed 12/27/90, effective 1/31/91. Statutory Authority: RCW
70.119.050. WSR 78-10-053 (Order 1343), § 248-55-030, filed 9/22/78.]