Chapter 246-359 WAC

Last Update: 6/15/15

TEMPORARY WORKER HOUSING CONSTRUCTION STANDARD

WAC Sections

HTMLPDF246-359-001Purpose and scope.
HTMLPDF246-359-005Applicability.
HTMLPDF246-359-010Definitions.
HTMLPDF246-359-020Powers and duties of the department of health.
HTMLPDF246-359-030Cooperation with the department of health—Right of entry.
HTMLPDF246-359-040Appeals.
HTMLPDF246-359-050Minor variances to the TWH construction standard.
HTMLPDF246-359-060Architect or engineer of record and plan submittal responsibilities.
HTMLPDF246-359-070Application and construction documents required for plan review.
HTMLPDF246-359-080Plan review approval and expiration of plan approval.
HTMLPDF246-359-090Issuing and maintaining a construction permit.
HTMLPDF246-359-100Expiration and extension of construction permits.
HTMLPDF246-359-110Construction without a permit.
HTMLPDF246-359-120Required inspections.
HTMLPDF246-359-130Stop work orders.
HTMLPDF246-359-140Certificate of completion.
HTMLPDF246-359-150Site requirements.
HTMLPDF246-359-160TWH minimum floor area and ceiling height.
HTMLPDF246-359-170Wood framed construction and concrete masonry unit (CMU) general limitations.
HTMLPDF246-359-180Concrete footings and foundations for wood framed construction.
HTMLPDF246-359-200Wood framed construction.
HTMLPDF246-359-210Treated wood foundations for wood framed construction.
HTMLPDF246-359-220Floor framing for wood framed construction.
HTMLPDF246-359-230Wall framing for wood framed construction.
HTMLPDF246-359-240Exterior wall covering for wood framed construction.
HTMLPDF246-359-250Roof framing for wood framed construction and concrete masonry units (CMU).
HTMLPDF246-359-300Ceiling framing for wood framed construction and concrete masonry units (CMU).
HTMLPDF246-359-310Roof sheathing for wood framed construction and concrete masonry units.
HTMLPDF246-359-320Roof covering materials for wood framed construction and concrete masonry units (CMU).
HTMLPDF246-359-330Roof framing ventilation for wood framed construction and concrete masonry units (CMU).
HTMLPDF246-359-340Nailing schedule wood framed construction and concrete masonry units.
HTMLPDF246-359-350Roof connections for concrete masonry units (CMU).
HTMLPDF246-359-400Concrete masonry unit (CMU).
HTMLPDF246-359-405Concrete masonry units (CMU) materials.
HTMLPDF246-359-410Foundations and footings for concrete masonry units (CMU) walls.
HTMLPDF246-359-420Placing of concrete masonry units (CMU).
HTMLPDF246-359-430Floors for concrete masonry units (CMU).
HTMLPDF246-359-440Walls of concrete masonry units (CMU).
HTMLPDF246-359-500Window construction requirements.
HTMLPDF246-359-510Door requirements.
HTMLPDF246-359-520Door landings, stairways and guardrails.
HTMLPDF246-359-530Interior finishes.
HTMLPDF246-359-540Lighting and electrical.
HTMLPDF246-359-550Smoke detectors and carbon monoxide detectors.
HTMLPDF246-359-560Plumbing.
HTMLPDF246-359-565Food-handling and eating facilities.
HTMLPDF246-359-570Mechanical installations.
HTMLPDF246-359-575Energy and ventilation and indoor air quality requirement exemptions.
HTMLPDF246-359-580Heating, insulation, and air conditioning.
HTMLPDF246-359-590Liquid petroleum gas (LP-gas) storage tanks.
HTMLPDF246-359-600Alternate construction.
HTMLPDF246-359-650Tents.
HTMLPDF246-359-700Approval of factory assembled structures (FAS).
HTMLPDF246-359-710Installation of factory assembled structures (FAS)—Except for manufactured homes.
HTMLPDF246-359-720Installation requirements for manufactured homes.
HTMLPDF246-359-730Manufactured home installers.
HTMLPDF246-359-740Drain connector to factory assembled structures (FAS).
HTMLPDF246-359-750Water connector to factory assembled structures (FAS).
HTMLPDF246-359-760Gas connections to factory assembled structures (FAS).
HTMLPDF246-359-800DOSH requirements affecting building TWH.
HTMLPDF246-359-990Fees.