PDFWAC 246-359-340

Nailing schedule wood framed construction and concrete masonry units.

All nailing must be completed according to Table 340.
Table 340
Nailing Schedule
connection
nailing1
1. Joist to sill or girder, toenail
3-8d
2. Bridging to joist, toenail each end
2-8d
3. 1" x 6" subfloor or less to each joist, face nail
2-8d
4. Wider than 1" x 6" subfloor to each joist, face nail
3-8d
5. 2" subfloor to joist or girder, blind and face nail
2-16d
6. Sole plate to joist or blocking, typical face nail
Sole plate to joist or blocking, at braced wall panels
16d at 16" o.c.
3-16d per 16"
7. Top plate to stud, end nail
2-16d
8. Stud to sole plate
4-8d, toenail or 2-16d, end nail
9. Double studs, face nail
16d at 24" o.c.
10. Doubled top plates, typical face nail
Doubled top plates, lap splice
16d at 16" o.c.
8-16d
11. Blocking between joists or rafters to top plate, toenail
3-8d
12. Rim joist to top plate, toenail
8d at 6" o.c.
13. Top plates, laps, and intersections, face nail
2-16d
14. Continuous header, two pieces
16d at 16" o.c. along each edge
15. Ceiling joists to plate, toenail
3-8d
16. Continuous header to stud, toenail
4-8d
17. Ceiling joists, laps over partitions, face nail
3-16d
18. Ceiling joists to parallel rafters, face nail
3-16d
19. Rafter to plate, toenail
3-8d
20. 1" brace to each stud and plate, face nail
2-8d
21. 1" x 8" sheathing or less to each bearing, face nail
2-8d
22. Wider than 1" x 8" sheathing to each bearing, face nail
3-8d
23. Built-up corner studs
16d at 24" o.c.
24. Built-up girder and beams
20d at 32" o.c. at top and bottom and staggered 2-20d at ends and at each splice
25. 2" planks
2-16d at each bearing
1 Common or boxed nails must be used.
[Statutory Authority: RCW 70.114A.081. WSR 99-03-065, § 246-359-340, filed 1/18/99, effective 2/18/99.]