PDF
WAC 296-52-60100
Daylight blasting.
Blasting operations must be conducted during daylight hours whenever possible.
[Statutory Authority: RCW
49.17.010
, [49.17].040, and [49.17].050. WSR 02-03-125, § 296-52-60100, filed 1/23/02, effective 3/1/02.]