Note: | Bus wires, depends on the size of the blast, fourteen gauge (American wire gauge) copper is recommended. |
(d) Lead wires.
(i) Shunting. You must shunt the ends of lead wires that will be connected to a firing device by twisting them together before they are connected to leg or connecting wires.
(ii) Control. The blaster in charge must keep control of shunted lead wires until loading is completed and the leg wires are attached.
(iii) Attachment. Lead wires must be attached by the blaster in charge when it is time to fire the shot.
(e) Detonator leg wires. Electric detonator leg wires must:
(i) Be kept shunted (short circuited) until they are connected into the circuit for firing.
(ii) Not be separated (except for testing) until all holes are loaded and the loader is ready to connect the leg wires to the connecting or lead wires.
(f) Circuits.
(i) Blasting circuits or power circuits must be used in electric blasting and according to the electric detonator manufacturer's recommendations.
(ii) Care must be taken to make sure an adequate quantity of delivered current is available according to the manufacturer's recommendations, when firing a circuit of electric detonators.
(iii) A power circuit used for firing electric detonators cannot be grounded.
(iv) The firing switch must be designed so the firing lines to the detonator circuit automatically short circuit when the switch is in the "off" position.
(v) The firing switch must be locked in the "open" or "off" position at all times, except when firing from a power circuit.
(g) Firing line insulation. The insulation on all firing lines must be adequate and in good condition when firing electrically.
(h) Testing.
(i) The firing line must be checked at the terminals with an approved testing device before being connected to the blasting machine or other power sources.
(ii) The circuit, including all detonators, must be tested with an approved testing device before being connected to the firing line.
(i) Switch keys. The blaster in charge is the only person who is allowed to have firing switch keys in their possession.
(j) Blasting machines. A nonelectric system must be used if these requirements cannot be satisfied:
(i) Blasting machines must be in good condition.
(ii) The efficiency of the blasting machine must be tested periodically to make sure it delivers power at its rated capacity.
(iii) Responsible person.
(A) The blaster in charge must be in charge of blasting machines.
(B) The blaster in charge must connect the lead wires to the blasting machine and must fire the shot.
(iv) Connections.
(A) When firing with blasting machines, connections must be made according to the manufacturer of the electric detonator's recommendations.
(B) All connections must be made from the drill hole back to the source of the firing current.
(C) Lead wires must remain shunted and not connected to the blasting machine or other source of current until the charge is ready to fire.
(D) The number of electric detonators connected to a blasting machine cannot exceed the blasting machine's rated capacity.
(v) Series circuit. In primary blasting, a series circuit cannot contain more detonators than the manufacturer's recommended limits for electric detonators.
(vi) Circuit testing. A blaster in charge must use blasting testers specifically designed to test circuits to charged holes.
(vii) Blasting near power lines. Whenever lead or blasting wires could be thrown over live overhead powerlines, communication lines, utility services, or other services or structures by the force of an explosion, care must be taken to make sure:
(A) The total length of wires are short enough so they will not hit the lines.
(B) The wires are securely anchored to the ground.
(C) The owners or operators of the utilities in the blast area are notified.
(viii) Disconnecting lead wires. After firing an electric blast from a blasting machine, lead wires must be immediately disconnected from the machine and short-circuited.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050, and
49.17.060. WSR 17-16-132, § 296-52-67090, filed 8/1/17, effective 9/1/17; WSR 06-19-074, § 296-52-67090, filed 9/19/06, effective 12/1/06. Statutory Authority: RCW
49.17.010, [49.17].040, and [49.17].050. WSR 02-03-125, § 296-52-67090, filed 1/23/02, effective 3/1/02.]