After we perform a final inspection of a factory-built, commercial structure, or component, we will send a notice to the local enforcement agency (NLEA) that:
(1) Specifies what connections, standards, and incomplete items the local enforcement agency must check when the unit is installed; and/or
(2) Estimates the expected time of arrival of the factory-built house or commercial structure to the site.
[Statutory Authority: RCW
43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150F-0550, filed 10/23/96, effective 11/25/96.]