Chapter 296-150R WAC

Last Update: 2/4/20

RECREATIONAL VEHICLES

WAC Sections

HTMLPDF296-150R-0010Authority, purpose, and scope.
HTMLPDF296-150R-0020What definitions apply to this chapter?
HTMLPDF296-150R-0030How is this chapter enforced?
HTMLPDF296-150R-0040Will you keep my manufacturing information confidential?
HTMLPDF296-150R-0050Can you prohibit the sale or lease of my recreational vehicle?
HTMLPDF296-150R-0060Who handles consumer complaints about recreational vehicles?
HTMLPDF296-150R-0100What happens if I disagree with the department's decision regarding my compliance with this chapter and ANSI?
HTMLPDF296-150R-0110Do you have an advisory board to address recreational vehicle issues?
HTMLPDF296-150R-0120Where can I obtain technical assistance regarding recreational vehicles?
HTMLPDF296-150R-0130Do you allow recreational vehicles to be displayed without an insignia?
HTMLPDF296-150R-0140Do you allow the use of alternate materials, alternate design and method of construction?
REQUIREMENTS FOR INSIGNIA AND OTHER VEHICLE IDENTIFICATION
HTMLPDF296-150R-0200Who should obtain recreational vehicle insignia?
HTMLPDF296-150R-0210How do I obtain insignia information and the forms you require?
HTMLPDF296-150R-0220How do I obtain insignia based on state-plan approval?
HTMLPDF296-150R-0230How do I obtain insignia based on self-certification approval?
HTMLPDF296-150R-0250How do I replace lost or damaged insignia?
HTMLPDF296-150R-0280What other vehicle identification is required?
HTMLPDF296-150R-0290When and where should the insignia and the vehicle identification label be attached to the vehicle?
STATE PLAN
HTMLPDF296-150R-0300What is required to obtain insignia based on state-plan approval?
HTMLPDF296-150R-0310What is required after I am approved as a state-plan manufacturer?
DESIGN PLAN
HTMLPDF296-150R-0320How do I apply for design-plan approval?
HTMLPDF296-150R-0330What is required for comprehensive design-plan approval?
HTMLPDF296-150R-0340What happens if you approve my design plan?
HTMLPDF296-150R-0350If my design plan is not approved, how much time do I have to submit a corrected plan?
QUALITY CONTROL PROGRAM/MANUAL
HTMLPDF296-150R-0400What constitutes an acceptable quality control program/manual for state-plan insignia?
HTMLPDF296-150R-0410How do I apply to have my quality control manual approved?
HTMLPDF296-150R-0420What happens if my quality control manual is approved?
DESIGN PLAN/QUALITY CONTROL MANUAL—REVIEW, CHANGE/ADDENDUM, EXPIRATION, AND RENEWAL
HTMLPDF296-150R-0440Do I need approval to change my design plan or quality control manual after I receive state-plan approval?
HTMLPDF296-150R-0450When does state-plan insignia approval expire?
INSPECTION
HTMLPDF296-150R-0600When does a manufacturer, individual builder, or a dealer need to request a vehicle inspection?
HTMLPDF296-150R-0610How do I request a vehicle inspection and what documentation is required?
HTMLPDF296-150R-0620What happens if my vehicle passes inspection?
HTMLPDF296-150R-0630What happens if my vehicle does not pass inspection?
HTMLPDF296-150R-0640Am I charged if I request an inspection but I am not prepared?
AUDIT
HTMLPDF296-150R-0700What does our annual quality control program audit for state-plan insignia include?
LOSS OF STATE-PLAN APPROVAL
HTMLPDF296-150R-0710Can you withdraw my state-plan insignia approval?
HTMLPDF296-150R-0720What happens if my state-plan insignia approval is withdrawn?
SELF-CERTIFICATION
AUDIT TO RECEIVE SELF-CERTIFICATION
HTMLPDF296-150R-0800What is required for self-certification?
HTMLPDF296-150R-0810What does the initial self-certification audit include?
HTMLPDF296-150R-0820How will I know if I am approved for self-certification?
HTMLPDF296-150R-0830What are the self-certification fees?
SELF-CERTIFICATION COMPREHENSIVE DESIGN PLAN/QUALITY CONTROL PROGRAM/QUALITY CONTROL MANUAL
HTMLPDF296-150R-0840What is required for comprehensive design plan approval for self-certification?
HTMLPDF296-150R-0850What constitutes an acceptable quality control program/manual for self-certification?
HTMLPDF296-150R-0860After becoming self-certified, do I need approval to change my comprehensive design plan?
HTMLPDF296-150R-0870After becoming self-certified, do I need approval to change my quality control manual?
AUDIT AFTER SELF-CERTIFICATION
HTMLPDF296-150R-0900When do you audit self-certified manufacturers?
HTMLPDF296-150R-0910After I am self-certified, what does an audit include?
LOSS OF SELF-CERTIFICATION
HTMLPDF296-150R-0920Can you withdraw my self-certification?
HTMLPDF296-150R-0930What happens if my self-certification is withdrawn?
VEHICLE ALTERATIONS
HTMLPDF296-150R-1000Who needs approval to alter a recreational vehicle?
HTMLPDF296-150R-1010Must I purchase a separate insignia for an alteration?
HTMLPDF296-150R-1020How do I apply for alteration approval and obtain the alteration insignia?
MANUFACTURER'S NOTICE TO THE DEPARTMENT
HTMLPDF296-150R-2000Must state-plan and self-certified manufacturers notify you if they manufacture at more than one location?
HTMLPDF296-150R-2010Must state-plan and self-certified manufacturers notify you if they change a business name or address?
HTMLPDF296-150R-2020Must state-plan and self-certified manufacturers notify you of a change in business ownership?
HTMLPDF296-150R-2030Must state-plan and self-certified manufacturers notify you of their Washington dealers?
RECREATIONAL VEHICLE AND PARK TRAILER FEES
HTMLPDF296-150R-3000Recreational vehicle fees.