Note: | We will provide you with a check list with detailed requirements for each type of plan upon request. |
(c) Current comprehensive design plans must be available at each manufacturing location.
(2) If you are a state-plan approved manufacturer applying for self-certification, you must have approved comprehensive design plans on file with us and at each manufacturing location.
[Statutory Authority: RCW
43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150R-0840, filed 10/23/96, effective 11/25/96.]