Chapter 296-150V WAC

Last Update: 9/20/22

CONVERSION VENDOR UNITS AND MEDICAL UNITS

WAC Sections

HTMLPDF296-150V-0010Authority, purpose, and scope.
HTMLPDF296-150V-0020What definitions apply to this chapter?
HTMLPDF296-150V-0030How is this chapter enforced?
HTMLPDF296-150V-0040Is manufacturing information kept confidential?
HTMLPDF296-150V-0050Can you prohibit the sale or lease of a conversion vendor unit or medical unit?
HTMLPDF296-150V-0060Who handles consumer complaints about conversion vendor units or medical units?
HTMLPDF296-150V-0070Do you have reciprocal agreements with other states to inspect conversion vendor units and medical units?
HTMLPDF296-150V-0080Do you allow a local enforcement agency to inspect conversion vendor units and medical units at the manufacturing location?
HTMLPDF296-150V-0100What happens if I disagree with your decision regarding my compliance with this chapter?
HTMLPDF296-150V-0110Do you have an advisory board to address conversion vendor unit and medical unit issues?
HTMLPDF296-150V-0120Where can I obtain technical assistance regarding conversion vendor units or medical units?
HTMLPDF296-150V-0140Do you allow the use of alternate materials, design, or method of construction?
HTMLPDF296-150V-0200Who must obtain conversion vendor unit or medical unit insignia?
HTMLPDF296-150V-0210What are the insignia requirements?
HTMLPDF296-150V-0220How do I obtain insignia information and the required forms?
HTMLPDF296-150V-0230What are the insignia application requirements?
HTMLPDF296-150V-0240What documentation do you need to perform an alteration inspection?
HTMLPDF296-150V-0250How do I replace lost or damaged insignia?
HTMLPDF296-150V-0300When is design-plan approval required?
HTMLPDF296-150V-0310Who can approve design plans?
HTMLPDF296-150V-0320What must I provide with my request for conversion vendor unit or medical unit design-plan approval by the department?
HTMLPDF296-150V-0340When is an engineering analysis or structural load test for design plans required?
HTMLPDF296-150V-0350What must test procedures and results for design plans include?
HTMLPDF296-150V-0380What happens if you approve my design plan?
HTMLPDF296-150V-0390If my design plan is not approved, how much time do I have to submit a corrected design plan?
HTMLPDF296-150V-0400What happens after my design plan is approved?
HTMLPDF296-150V-0410When does my design plan expire?
HTMLPDF296-150V-0415Who approves addendums to design plans?
HTMLPDF296-150V-0495Contractor deposit accounts.
HTMLPDF296-150V-0500When is an inspection required?
HTMLPDF296-150V-0510How do I request an inspection?
HTMLPDF296-150V-0520What happens if my conversion vendor unit or medical unit passes inspection?
HTMLPDF296-150V-0530Am I charged if I request an inspection but I am not prepared?
HTMLPDF296-150V-0540Who inspects a conversion vendor unit or medical unit installation at the building site or event location?
HTMLPDF296-150V-0550Do you allow a conversion vendor unit or medical unit to be completed at the installation site?
HTMLPDF296-150V-0560What happens if I receive a notice of noncompliance after inspection of the alteration to my conversion vendor unit or medical unit?
HTMLPDF296-150V-0580Must I obtain an insignia for used conversion vendor units or medical units?
HTMLPDF296-150V-0590How do I obtain insignia for used conversion vendor units or medical units?
HTMLPDF296-150V-0700Must manufacturers of conversion vendor units and medical units notify you if they manufacture at more than one location?
HTMLPDF296-150V-0710Must manufacturers of conversion vendor units and medical units notify you of a change in business name or address?
HTMLPDF296-150V-0720Must manufacturers of conversion vendor units and medical units notify you of a change in business ownership?
HTMLPDF296-150V-0800What codes apply to conversion vendor units or medical units?
HTMLPDF296-150V-0930When are structural load tests or structural calculations required?
HTMLPDF296-150V-0950What requirements apply to roof coverings?
HTMLPDF296-150V-1040Are there floor requirements?
HTMLPDF296-150V-1070What requirements apply to floor closure material?
HTMLPDF296-150V-1090What are the standards for equipment and installations?
HTMLPDF296-150V-1100What are the flame-spread limitations?
HTMLPDF296-150V-1110Combustible limitations.
HTMLPDF296-150V-1120What are the standards for wall and cabinet protection?
HTMLPDF296-150V-1170What are the light and ventilation requirements?
HTMLPDF296-150V-1180What requirements apply to conversion vendor unit exits?
HTMLPDF296-150V-1185What exit door requirements apply to self-propelled medical unit exits?
HTMLPDF296-150V-1190Interior privacy locks.
HTMLPDF296-150V-1303How must storage batteries be installed in a conversion vendor unit or medical unit?
HTMLPDF296-150V-1330What are the mechanical requirements for a conversion vendor unit or medical unit?
HTMLPDF296-150V-1350What are the LPG system enclosure and mounting requirements for a conversion vendor unit or medical unit?
HTMLPDF296-150V-1360What are the fuel gas piping design requirements for a conversion vendor unit or medical unit?
HTMLPDF296-150V-1380Can gas tubing be concealed in a conversion vendor unit or medical unit?
HTMLPDF296-150V-1390What are the pipe-joint compound requirements for gas piping in a conversion vendor unit or medical unit?
HTMLPDF296-150V-1400What are the gas piping hanger and support requirements for a conversion vendor unit or medical unit?
HTMLPDF296-150V-1410What are the electrical bonding requirements for gas piping in a conversion vendor unit or medical unit?
HTMLPDF296-150V-1420How are gas supply connections in a conversion vendor unit or medical unit identified?
HTMLPDF296-150V-1430What requirements apply to gas piping system openings?
HTMLPDF296-150V-1440Are gas piping shut-off valves required in a conversion vendor unit or medical unit?
HTMLPDF296-150V-1450What requirements apply to testing for gas piping leaks before conversion vendor unit or medical unit appliances are connected?
HTMLPDF296-150V-1460What requirements apply to testing for gas piping leaks after conversion vendor unit or medical unit appliances are connected?
HTMLPDF296-150V-1470What are the requirements for appliance installations?
HTMLPDF296-150V-1530What general plumbing requirements apply?
HTMLPDF296-150V-1540What are the plumbing definitions?
HTMLPDF296-150V-1550What requirements apply to drain outlets?
HTMLPDF296-150V-1560What is the minimum clearance for drain outlets?
HTMLPDF296-150V-1570What requirements apply to water-supply connections?
HTMLPDF296-150V-1580What requirements apply to water heater relief valves and safety devices?
HTMLPDF296-150V-1590What requirements apply to waste holding tanks for conversion vendor units?
HTMLPDF296-150V-1600What are the requirements associated with medical and conversion vending units that have been manufactured and used outside the state according to RCW 43.22.380?
HTMLPDF296-150V-3000Conversion vendor units and medical units—Fees.
DISPOSITION OF SECTIONS FORMERLY CODIFIED IN THIS TITLE
296-150V-0205Can I obtain an exempt vendor/medical insignia? [Statutory Authority: Chapter 43.22 RCW and 2003 c 291. WSR 05-01-102, § 296-150V-0205, filed 12/14/04, effective 2/1/05.] Repealed by WSR 16-13-119, filed 6/21/16, effective 6/21/16. Statutory Authority: Chapter 43.22 RCW.
296-150V-1220What code and installation requirements apply to conversion vendor unit or medical unit electrical systems? [Statutory Authority: RCW 43.22.340, 43.22.350, 43.22.355, 43.22.360, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.450, 43.22.480, and 43.22.485. WSR 00-17-148, § 296-150V-1220, filed 8/22/00, effective 9/30/00. Statutory Authority: Chapter 43.22 RCW. WSR 99-18-069, § 296-150V-1220, filed 8/31/99, effective 10/1/99.] Repealed by WSR 03-12-044, filed 5/30/03, effective 6/30/03. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW.