Before issuing a building permit, a city, county or town must verify the registration of the general or specialty contractor applying for the permit.
[Statutory Authority: Chapter
18.27 RCW. WSR 97-24-071, § 296-200A-110, filed 12/2/97, effective 1/5/98.]