EXEMPTION: | A scaffold may be moved horizontally with employees on it if the scaffold: |
| 1. Has been specifically designed for such movement by a registered professional engineer; or |
| 2. Is a mobile scaffold that meets the requirements of the section, Meet these requirements when moving mobile scaffolds, WAC 296-874-40012. |
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050. WSR 15-23-086, § 296-874-20040, filed 11/17/15, effective 12/18/15. Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050,
49.17.060. WSR 05-01-054, § 296-874-20040, filed 12/7/04, effective 3/1/05.]