DNR normally requires a proponent to prepare or help prepare draft, final, and supplemental EISs at the proponent's expense. An outside consultant may be used to complete an EIS only if DNR and the proponent mutually agree upon the consultant. Any proponent or consultant preparing an EIS shall do so under DNR's direction.
[Statutory Authority: Chapters
43.21C,
34.05 RCW, WAC 197-11-902(2), and [197-11]-904(1). WSR 07-08-021, § 332-41-421, filed 3/27/07, effective 4/27/07.]