All wells must be drilled with due diligence to maintain a reasonably vertical well bore unless special circumstances require the bore to deviate from the vertical, in which instance permission to so deviate shall be obtained from the supervisor. The committee shall have the right to require the operator to make a directional survey of the hole, at the request of an off-set operator and at the expense of said off-set operator towards whom the well is being drilled prior to the completion of the well; and the committee shall have the right to require the operator to make a directional survey of the hole at any time, and at the expense of the operator, in order to ascertain that the well has not deviated beyond the boundaries of property on which well is located.
[Statutory Authority: RCW
78.52.050 and chapter
78.52 RCW. WSR 82-12-052 (Order 3, Resolution No. 7), § 344-12-075, filed 6/1/82; Rule 13, filed 3/23/60.]