PDF
WAC 372-36-110
Specific requirements of each industry—Sand and gravel washing.
No sand and gravel washings will be discharged to a drain or wasteway unless first passed through a lagoon with a settling period of 2 days.
[Rule .04.243 (C)(6), filed 3/1/60.]