The department will evaluate its contractors as follows:
(1) To measure compliance with our requirements we will conduct a biennial evaluation of each contractor;
(2) Emergency shelters will be inspected during on-site evaluations of contractors to measure compliance with our facility requirements; and
(3) If a lodging unit of the emergency shelter is occupied at the time of an on-site evaluation, the contractor must give the client an opportunity to leave the unit prior to the arrival of the evaluator.
[Statutory Authority: Chapter
70.123 RCW. WSR 18-09-015, § 388-61A-1210, filed 4/10/18, effective 5/11/18.]