The purpose of this section is to set forth provisions designed to further enhance cost effectiveness in the construction of exclusively new school facilities.
(1) Districts become eligible for a cost saving incentive equal to sixty percent of the state share of the construction cost savings if the cost of new construction at bid is less than the state maximum allowable construction cost as set forth in WAC
392-343-020 (2)(a).
(2) The state funding assistance fee for basic architectural and engineering services shall not be reduced if the project is bid and is awarded below the state maximum allowable costs for architectural and engineering services (WAC
392-343-070) or the cost contracted for between the school district and architect/engineer, whichever is less.
(3) Any project attached to or adjacent to or otherwise designed to operate in conjunction with an existing facility and which contains additional area equal to or less than fifty percent of the area in the existing facility shall be classified as an addition and shall not be eligible for the cost saving incentive option authorized in this section.
(4) Districts shall not be eligible for a cost-saving incentive where the entire project, or any part of the project, qualifies for state funding assistance under chapter
392-347 WAC.
(5) Receipt of a portion of the state share of construction cost savings shall not reduce the district's future eligibility and entitlement to state funding assistance in providing school facilities and shall not result in the district receiving more than one hundred percent of the cost of construction.
[Statutory Authority: RCW
28A.525.020. WSR 10-09-008, § 392-343-085, filed 4/8/10, effective 5/9/10; WSR 06-16-032, amended and recodified as § 392-343-085, filed 7/25/06, effective 8/25/06. Statutory Authority: RCW
28A.47.830. WSR 85-24-048 (Order 25-85), § 180-27-085, filed 11/27/85; WSR 83-21-066 (Order 11-83), § 180-27-085, filed 10/17/83.]