Location | Cover (inches) For normal excavation | Cover (inches) For rock excavation |
Industrial, commercial, and residential areas | 36 | 30 |
Crossings of inland bodies of water with a width of at least 100 ft. from high water mark to high water mark | 48 | 18 |
Drainage ditches at public roads and railroads | 36 | 36 |
Deepwater port safety zone | 48 | 24 |
Any other area | 30 | 18 |
Note: | Rock excavation is any excavation that requires blasting or removal by equivalent means. |
(2) Cover less than the minimum required by subsection (1) of this section may be used if:
(a) It is impracticable for the pipeline company to comply with the minimum cover requirements; and
(b) The pipeline company provides additional protection equivalent to the minimum required cover.
[Statutory Authority: RCW
80.01.040,
80.04.060,
81.88.040. WSR 08-12-045 (Docket PL-070974, General Order R-548), § 480-75-640, filed 5/30/08, effective 6/30/08. Statutory Authority: RCW
80.01.040 and
80.04.160. WSR 02-18-032 (Docket No. TO-000712, General Order No. R-500), § 480-75-640, filed 8/26/02, effective 9/26/02.]