The purpose of these rules is to ensure that the utility meets the clean energy transformation standards outlined in WAC 480-100-610 in a timely manner and at the lowest reasonable cost.
[Statutory Authority: RCW 80.01.040, 80.04.160, and chapters 80.28, 19.280, and 19.405 RCW. WSR 21-02-022 (Dockets UE-191023 and UE-190698, General Order 601), § 480-100-600, filed 12/28/20, effective 12/31/20.]