PERMANENT RULES
LABOR AND INDUSTRIES
Date of Adoption: December 22, 1999.
Purpose: To repeal all regulations and references to vendor units from chapter 296-150C WAC, Commercial coaches, because vendor units are now covered in new chapter 296-150V WAC, Conversion vendor units and medical units.
Citation of Existing Rules Affected by this Order: Repealing WAC 296-150C-0330, 296-150C-1580, 296-150C-1590, 296-150C-1600, 296-150C-1610, 296-150C-1620, 296-150C-1630, 296-150C-1640, 296-150C-1650, 296-150C-1660, 296-150C-1670, 296-150C-1680, 296-150C-1690, 296-150C-1700, 296-150C-1710, 296-150C-1720, 296-150C-1730, 296-150C-1740, 296-150C-1750, 296-150C-1751, 296-150C-1752, 296-150C-1753, 296-150C-1754, 296-150C-1755, 296-150C-1756, 296-150C-1757, 296-150C-1758, 296-150C-1759, 296-150C-1760, 296-150C-1770, 296-150C-1780, 296-150C-1790, 296-150C-1800, 296-150C-1810, 296-150C-1820, and 296-150C-1830.
Statutory Authority for Adoption: RCW 43.22.480.
Adopted under preproposal statement of inquiry filed as WSR 99-16-113 on August 4, 1999.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's Own Initiative: New 0, Amended 0, Repealed 36.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted Using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 0, Repealed 0. Effective Date of Rule: February 8, 2000.
December 22, 1999
Gary Moore
Director
OTS-3169.3
REPEALER
The following sections of the Washington Administrative Code are repealed:
WAC 296-150C-0330 | What must I provide with my request for a commercial coach vendor unit design-plan approval by the department? |
WAC 296-150C-1580 | What manufacturing codes apply when converting structures to vendor units? |
WAC 296-150C-1590 | Is a structural analysis required when converting a vehicle or structure to a vendor unit? |
WAC 296-150C-1600 | What are the live load requirements of a vendor unit? |
WAC 296-150C-1610 | Design load deflection. |
WAC 296-150C-1620 | Structural load tests. |
WAC 296-150C-1630 | Roof coverings/membrane/weather resistant. |
WAC 296-150C-1640 | Floors. |
WAC 296-150C-1650 | Floor closure material. |
WAC 296-150C-1660 | Chassis approval. |
WAC 296-150C-1670 | Standards for equipment and installations. |
WAC 296-150C-1680 | Flame-spread limitations. |
WAC 296-150C-1690 | Cabinet protection. |
WAC 296-150C-1700 | Insulation standards. |
WAC 296-150C-1710 | Light and ventilation. |
WAC 296-150C-1720 | What requirements apply to vending unit exits? |
WAC 296-150C-1730 | What code and installation requirements apply to vendor unit electrical systems? |
WAC 296-150C-1740 | What are the mechanical requirements for a vendor unit? |
WAC 296-150C-1750 | What are the LPG system enclosure and mounting requirements for a vendor unit? |
WAC 296-150C-1751 | What are the fuel gas piping design requirements for a vendor unit? |
WAC 296-150C-1752 | Can gas tubing be concealed in a vendor unit? |
WAC 296-150C-1753 | What are the pipe-joint compound requirements for gas piping in a vendor unit? |
WAC 296-150C-1754 | What are the gas piping hanger and support requirements for a vendor unit? |
WAC 296-150C-1755 | What are the electrical bonding requirements for gas piping in a vendor unit? |
WAC 296-150C-1756 | How are gas supply connections in a vendor unit identified? |
WAC 296-150C-1757 | What requirements apply to gas piping system openings? |
WAC 296-150C-1758 | Are gas piping shut-off valves required in a vendor unit? |
WAC 296-150C-1759 | What requirements apply to testing for gas piping leaks before vendor unit appliances are connected? |
WAC 296-150C-1760 | What requirements apply to testing for gas piping leaks after vendor unit appliances are connected? |
WAC 296-150C-1770 | Appliances -- Installation. |
WAC 296-150C-1780 | Safety devices -- Water heater relief valves. |
WAC 296-150C-1790 | Plumbing -- General. |
WAC 296-150C-1800 | Plumbing -- Definitions. |
WAC 296-150C-1810 | Drainage -- Cap or plug. |
WAC 296-150C-1820 | Drainage -- Clearance from drain outlet. |
WAC 296-150C-1830 | Water supply connection. |