WSR 21-01-190
PROPOSED RULES
DEPARTMENT OF
LABOR AND INDUSTRIES
[Filed December 22, 2020, 9:12 a.m.]
Original Notice.
Preproposal statement of inquiry was filed as WSR 20-22-078.
Title of Rule and Other Identifying Information: Proposed fee increase for the following factory assembled structures (FAS) rules: WAC 296-150C-3000 Commercial coach fees, 296-150F-3000 Factory-built housing and commercial structure fees, 296-150I-3000 Penalties, fees, and refunds (Manufactured Home Installer Training and Certification Program), 296-150M-3000 Manufactured/mobile home fees, 296-150P-3000 Recreational park trailer fees, 296-150T-3000 Factory-built temporary worker housing fees, and 296-150V-3000 Conversion vendor units and medical unitsFees.
Hearing Location(s): On January 27, 2021, at 9:00 a.m. Telephonic hearing only. Please call 1-866-715-6499. When prompted for the passcode, enter 9862128073# (pound sign must be entered). The telephonic hearing starts at 9:00 a.m. and will continue until all oral comments are received.
Date of Intended Adoption: February 16, 2021.
Submit Written Comments to: Alicia Curry, Department of Labor and Industries (L&I), P.O. Box 44400, Olympia, WA 98504-4400, email Alicia.Curry@Lni.wa.gov, fax 360-902-5292, by 5 p.m., on January 27, 2021.
Assistance for Persons with Disabilities: Alicia Curry, phone 360-902-6244, fax 360-902-5292, email Alicia.Curry@Lni.wa.gov, by January 13, 2021.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: The purpose of this rule making is to propose changes to the FAS rules to increase fees by 5.91 percent. The fee increase is the maximum allowed by the state office of financial management for fiscal year 2021.
Reasons Supporting Proposal: The budget and projected revenue of the FAS program was evaluated and a fee increase is needed to support the cost of ongoing services. A fee increase will enable the program to continue providing quality and timely services to assure [ensure] the health and safety of Washington state citizens who work and live in factory-built housing and commercial structures.
Statutory Authority for Adoption: Chapter 43.22 RCW, Department of labor and industries; and chapter 43.22A WAC, Mobile and manufactured home installation.
Statute Being Implemented: Chapter 43.22 RCW, Department of Labor and Industries and chapter 43.22A WAC, Mobile and manufactured home installation.
Rule is not necessitated by federal law, federal or state court decision.
Name of Proponent: L&I, governmental.
Name of Agency Personnel Responsible for Drafting: Shane Daugherty, Program Manager, Tumwater, Washington, 360-902-5218; Implementation and Enforcement: Steve Reinmuth, Assistant Director, Tumwater, Washington, 360-902-6348.
A school district fiscal impact statement is not required under RCW 28A.305.135.
A cost-benefit analysis is not required under RCW 34.05.328. The rule is exempt from the cost-benefit analysis requirement under the Administrative Procedure Act, RCW 34.05.328 (5)(b)(vi) Rules that set or adjust fees under the authority of RCW 19.02.075 or that set or adjust fees or rates pursuant to legislative standards, including fees set or adjusted under the authority of RCW 19.80.045.
This rule proposal, or portions of the proposal, is exempt from requirements of the Regulatory Fairness Act because the proposal:
Is exempt under RCW 19.85.025(3) as the rules set or adjust fees under the authority of RCW 19.02.075 or that set or adjust fees or rates pursuant to legislative standards, including fees set or adjusted under the authority of RCW 19.80.045.
December 22, 2020
Joel Sacks
Director
OTS-2731.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150C-3000Commercial coach fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction: VB
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.382))0.404. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.546))0.578. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x (($83.00))$87.90 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.163))0.173. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.273))0.289. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A and I occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($19.60))$20.70 + (($6.50))$6.80 per fixture . . . .
$
. . . . .
12.
Medical gas (($19.60))$20.70 + (($6.50))$6.80 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10.92))11.56% of building permit + (($83.00))$87.90. . . .
$
. . . . .
RESUBMITTAL
14.
((10.92))11.56% of building permit + (($83.00))$87.90. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
INSIGNIA FEES
16.
FIRST SECTION
$
((24.90))
26.30
17.
EACH ADDITIONAL SECTION
$
((15.30))
16.20
TOTAL FEES
18.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
19.
Total fees due:
Includes plan fees and insignia fees . . . .
$
. . . . .
20.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009 International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
 
INITIAL FILING FEE (first time applicants)
(($41.00))
$43.40
 
DESIGN PLAN FEES:
 
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.092))1.156*
 
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.092))1.156*
 
 
 
RENEWAL FEE - 10% of permit fee × ((1.092))1.156 +
(($83.00))
$87.90
 
 
RESUBMIT FEE - 10% of permit fee × ((1.092))1.156 +
(($83.00))
$87.90
 
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.092))1.156 +
(($83.00))
$87.90
 
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.80))$6.10 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
 
PLUMBING PLAN FEE, (($19.60))$20.70 + PER FIXTURE FEE of
(($6.50))
$6.80
 
 
MEDICAL GAS PLAN FEE, (($19.60))$20.70 + PER OUTLET FEE of
(($6.50))
$6.80
 
 
Note: Mechanical systems are included in the primary plan fee
 
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
 
MASTER DESIGN - 25% of permit fee × ((1.092))1.156
 
 
 
One year design 15% of the permit fee × ((1.092))1.156
 
 
ELECTRICAL PLAN REVIEW - Find fee @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
 
RECIPROCAL PLAN REVIEW:
 
 
 
INITIAL FEE - MASTER DESIGN (minimum 3 hours)
(($83.00))
$87.90 per hour
 
 
INITIAL FEE - ONE YEAR DESIGN (minimum 2 hours)
(($83.00))
$87.90 per hour
 
 
RENEWAL FEE (minimum 1 hour)
(($83.00))
$87.90 per hour
 
 
ADDENDUM (minimum 1 hour)
(($83.00))
$87.90 per hour
 
PLANS APPROVED BY PROFESSIONALS - 10% of permit fee × ((1.092))1.156 +
(($83.00))
$87.90
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS - 5% of permit fee × ((1.092))1.156 +
(($83.00))
$87.90
 
DEPARTMENT INSPECTION FEES
 
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time* and mileage***)
(($83.00))
$87.90
 
 
TRAVEL (Per hour)
(($83.00))
$87.90
 
 
PER DIEM***
 
 
 
HOTEL****
 
 
 
MILEAGE***
 
 
 
RENTAL CAR****
 
 
 
PARKING****
 
 
 
AIRFARE****
 
 
DEPARTMENT AUDIT FEES:
 
 
 
AUDIT (Per hour*)
(($83.00))
$87.90
 
 
TRAVEL (Per hour**)
(($83.00))
$87.90
 
 
PER DIEM***
 
 
 
HOTEL****
 
 
 
MILEAGE***
 
 
 
RENTAL CAR****
 
 
 
PARKING****
 
 
 
AIRFARE****
 
 
 
ALTERATION INSPECTION (one hour minimum + alteration insignia fee)
(($107.90))
$114.20
 
INSIGNIA FEES:
 
 
 
FIRST SECTION (NEW or ALTERATION)
(($24.90))
$26.30
 
 
EACH ADDITIONAL SECTION (NEW or ALTERATION)
(($15.30))
$16.20
 
 
REISSUED-LOST/DAMAGED
(($15.30))
$16.20
 
OTHER FEES:
 
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
(($83.00))
$87.90
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
(($15.30))
$16.20
 
REFUND FEE
(($27.30))
$28.90
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments
***
Per state guidelines
****
Actual charges incurred
OTS-2732.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150F-3000Factory-built housing and commercial structure fees.
GENERAL INFORMATION
Manufacture:
 
Manufacturer #
 
1.
Building use:
 
2.
Building occupancy:
 
3.
Type of construction:
 
4.
Square footage of building:
 
5.
Valuation of the building shall be based on the following:
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by ((0.382))0.404. . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by ((0.546))0.578. . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x (($93.40))$98.90 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
 
 
 
a.
One year design—Multiply the total on line 7 by ((0.163))0.173. . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by ((0.273))0.289. . . .
$
. . . . .
Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing (($19.60))$20.70 + (($6.50))$6.80 per fixture . . . .
$
. . . . .
12.
Medical gas (($19.60))$20.70 + (($6.50))$6.80 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
((10.92))11.56% of building permit + (($93.40))$98.90. . . .
$
. . . . .
RESUBMITTAL
14.
((10.92))11.56% of building permit + (($93.40))$98.90. . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906(9) for electrical review fees
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
16.
Notification to local enforcement agency fee:
$
((40.30))
42.60
INSIGNIA FEES
17.
FIRST SECTION
$
((298.70))
316.30
18.
EACH ADDITIONAL SECTION
$
((26.70))
28.20
TOTAL FEES
19.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
20.
Total fees due:
Includes plan fees, insignia fees, and NLEA fees . . . .
$
. . . . .
21.
Total amount paid. . . .
$
. . . . .
Square Foot Construction Costs (BVD Table)a, b, c, and d
Group (2009
International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Table 1-A - Building Permit Fees
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
INITIAL FILING FEE (first time applicants)
(($72.90))
$77.20
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.092))1.156*
 
 
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.092))1.156*
 
 
RENEWAL FEE - 10% of permit fee × ((1.092))1.156 +
(($93.40))
$98.90
 
RESUBMIT FEE - 10% of permit fee × ((1.092))1.156 +
(($93.40))
$98.90
 
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.092))1.156 +
(($93.40))
$98.90
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.80))$6.10 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
PLUMBING PLAN FEE, (($19.60))$20.70 + PER FIXTURE FEE of
(($6.50))
$6.80
 
MEDICAL GAS PLAN FEE, (($19.60))$20.70 + PER OUTLET FEE of
(($6.50))
$6.80
 
Note: Mechanical systems are included in the primary plan fee
 
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
 
 
MASTER DESIGN - 25% of permit fee × ((1.092))1.156
 
 
One year design - 15% of the permit fee × ((1.092))1.156
 
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE-MASTER DESIGN (minimum 3 hours)
(($93.40))
$98.90 per hour
 
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours)
(($93.40))
$98.90 per hour
 
RENEWAL FEE (minimum 1 hour)
(($93.40))
$98.90
 
ADDENDUM (minimum 1 hour)
(($93.40))
$98.90 per hour
PLANS APPROVED BY DESIGN PROFESSIONALS - 10% of permit fee × ((1.092))1.156 +
(($93.40))
$98.90
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × ((1.092))1.156 +
(($93.40))
$98.90
DEPARTMENT INSPECTION FEES
 
 
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***)
(($93.40))
$98.90
 
TRAVEL (Per hour**)
(($93.40))
$98.90
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (Per hour**)
(($93.40))
$98.90
 
TRAVEL (Per hour**)
(($93.40))
$98.90
 
PER DIEM***
 
 
HOTEL****
 
 
MILEAGE***
 
 
RENTAL CAR****
 
 
PARKING****
 
 
AIRFARE****
 
INSIGNIA FEES:
 
 
FIRST SECTION
(($298.70))
$316.30
 
EACH ADDITIONAL SECTION
(($26.70))
$28.20
 
REISSUED-LOST/DAMAGED
(($72.90))
$77.20
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
(($93.40))
$98.90
 
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
(($40.30))
$42.60
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
(($14.90))
$15.70
REFUND FEE
(($27.30))
$28.90
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate.
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
***
Per state guidelines.
****
Actual charges incurred.
OTS-2733.1
AMENDATORY SECTION(Amending WSR 18-24-102, filed 12/4/18, effective 1/4/19)
WAC 296-150I-3000Penalties, fees, and refunds.
Penalties
(1) Monetary penalties for infractions listed in WAC 296-150I-0210 shall be assessed for each violation of chapter 43.22A RCW in the following amount:
(a) Failure to have a certified installer on the installation site whenever installation work is being performed:
 
First Final Violation
$250.00
 
Each Additional Final Violation
$1,000.00
(b) Failure to correct all nonconforming aspects of the installation identified by the local enforcement agency or by an authorized representative of the department within thirty days of issuance of notice of the same:
 
First Final Violation
Warning
 
Second Final Violation
$250.00
 
Third Final Violation
$500.00
 
Each Additional Final Violation
$1,000.00
(c) Failure by a certified installer to affix a certification tag to an installed manufactured/mobile home:
 
First Final Violation
Warning
 
Second Final Violation
$250.00
 
Third Final Violation
$500.00
 
Each Additional Final Violation
$1,000.00
(d) Transfer of certification tag(s) from a certified installer to another certified installer without prior written approval of the department:
 
First Final Violation
Warning
 
Each Additional Final Violation
$250.00
(e) Transfer of certification tag(s) from a certified installer to a noncertified installer:
 
First Final Violation to Each Contractor in Violation
$250.00
 
Each Additional Final Violation to Each Contractor in Violation
$1,000.00
(f) Transfer of unused installer certification tags by a manufactured home retailer to a new ownership without prior written approval of the department:
 
First Final Violation
Warning
 
Each Additional Final Violation
$250.00
Fees and Refunds
The following fees are payable to the department in advance:
 
Training and certification
(($270.40))
$286.30
 
Training only 10 hours
(($135.20))
$143.10
 
Manufactured/mobile home installation inspector training
(($135.20))
$143.10
 
Refund
(($27.00))
$28.50
 
Certification renewal
(($135.20))
$143.10
 
Continuing education class
(($54.00))
$57.10
 
Retake failed examination and training
(($40.50))
$42.80
 
Manufactured home installer training manual
(($13.50))
$14.20
 
Installer certification tag
(($9.40))
$9.90
(2) The department shall refund fees paid for training and certification or certification renewal as a manufactured home installer if the application is denied for failure of the applicant to comply with the requirements of chapter 43.22A RCW or these rules.
(3) If an applicant has paid fees to attend training or to take an examination and is unable to attend the scheduled training or examination, the applicant may:
(a) Change to another scheduled training and examination; or
(b) Request a refund.
(4) An applicant who fails the examination shall not be entitled to a refund.
OTS-2734.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150M-3000Manufactured/mobile home fees.
DESIGN PLAN FEES:
 
 
STRUCTURAL ALTERATION
(($181.50))$192.20
 
RESUBMITTAL FEE
(($80.20))$84.90
 
ADDENDUM (Approval expires on the same date as original plan.)
(($80.20))$84.90
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.60))$5.90 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT INSPECTION FEES:
 
 
Combination permit - Mechanical and electrical inspections
(($198.30))$210.00
 
Heat pump
(($198.30))$210.00
 
Air conditioning
(($198.30))$210.00
 
Air conditioning with replacement furnace
(($198.30))$210.00
 
Gas furnace installation includes gas piping
(($198.30))$210.00
 
Fire safety inspection
(($198.30))$210.00
MECHANICAL
(($88.10))
 
Gas*** Piping
(($88.10))$93.30
 
Wood Stove
(($88.10))$93.30
 
Pellet Stove
(($88.10))$93.30
 
Gas*** Room Heater
(($88.10))$93.30
 
Gas*** Decorative Appliance
(($88.10))$93.30
 
Range: Changing from electric to gas***
(($88.10))$93.30
 
Gas*** Water Heater Replacement
(($66.00))$69.90
ELECTRICAL
(($110.30))
 
Electric Water Heater Replacement
(($110.30))$116.80
 
Electric Water Heater replacing Gas*** Water Heater
(($110.30))$116.80
 
Each added or modified 120 volt circuit (maximum charge is two circuits)
(($110.30))$116.80
 
Each added 240 volt circuit (for other than Heat Pumps, Air Conditioners, Furnaces, Water Heaters, Ranges, Hot Tubs or Spas)
(($110.30))$116.80
 
Hot Tub or Spa (power from home electrical panel)
(($110.30))$116.80
 
Replace main electrical panel/permanently installed transfer equipment
(($110.30))$116.80
 
Low voltage fire/intrusion alarm
(($110.30))$116.80
 
Any combination of Furnace, Range and Water Heater changing from electric to gas***
(($110.30))$116.80
PLUMBING
 
 
Fire sprinkler system
(($247.80))$262.40
 
Each added fixture
(($66.00))$69.90
 
Replacement of water piping system (this includes two inspections)
(($221.20))$234.20
STRUCTURAL
 
 
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking)
(($98.90))$104.70
 
Reroofs (may require a plan review)
(($176.70))$187.10
 
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review)
(($176.70))$187.10
 
Other structural changes (may require a plan review)
(($176.70))$187.10
MISCELLANEOUS
 
 
OTHER REQUIRED INSPECTIONS (Per hour*)
(($72.40))$76.60
 
ALL REINSPECTIONS (Per hour*)
(($72.40))$76.60
 
Refund
(($21.90))$23.10
INSIGNIA FEES:
 
 
REISSUED - LOST/DAMAGED
(($21.90))$23.10
IPIA
 
DEPARTMENT AUDIT FEES
 
 
REGULARLY SCHEDULED IPIA AUDIT:
 
 
 
First inspection on each section (one time only)
(($36.30))$38.40
 
 
Second and succeeding inspections of unlabeled sections (Per hour*)
(($80.20))$84.90
 
OTHER IPIA FEES:
 
 
 
Red tag removal during a regularly scheduled IPIA audit (Per hour*separate from other fees)
(($80.20))$84.90
 
 
Red tag removal at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
Increased frequency surveillance (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
Attendance at manufacturers training classes (Per hour* only)
(($80.20))$84.90
 
 
Subpart "I" investigations (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
Alterations to a labeled unit (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
IPIA Issues/Responses (Per hour* Plus travel time* and mileage**)
(($80.20))$84.90
 
 
Monthly surveillance during a regularly scheduled IPIA audit (Per hour*plus travel time* and mileage**)
(($80.20))$84.90
 
 
Monthly surveillance at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
Plant certifications, recertifications and addenda updates (Per hour* plus travel time* and mileage** per each inspector)
(($80.20))$84.90
 
 
Response to HBT Audit during a regularly scheduled IPIA audit (Per hour*)
(($80.20))$84.90
 
 
Response to HBT Audit at a time other than a regularly scheduled IPIA audit (Per hour* plus travel time*and mileage**)
(($80.20))$84.90
 
 
Alternative construction (AC) letter inspections at placement site (Per hour* plus travel time*and mileage**)
(($80.20))$84.90
 
 
Replacement of HUD labels (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
State Administrative Agency (SAA) inspection fee (Per hour* plus travel time* and mileage**)
(($80.20))$84.90
 
 
State Administrative Agency (SAA) dispute resolution filing fee
(($80.20))$84.90
 
 
State Administrative Agency (SAA) dispute resolution (Per hour*)
(($80.20))$84.90
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour plus travel time* and mileage**)
(($74.50))$78.90
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
(($14.60))$15.40
 
VARIANCE INSPECTION FEE
(($176.70))$187.10
 
HOMEOWNER REQUESTED INSPECTION
(($176.70))$187.10
 
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME
(($176.70))$187.10
 
DEMOLITION OF A MOBILE/MANUFACTURED HOME
(($176.70))$187.10
 
ENERGY CONSERVATION PERMIT
(($30.10))$31.80
NOTE: 
Local jurisdictions may have other fees that apply.
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Gas means all gases; natural, propane, etc.
OTS-2735.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150P-3000Recreational park trailer fees.
INITIAL FILING FEE
(($37.80))$40.00
DESIGN PLAN FEES:
 
 
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS
(($107.20))$113.50
 
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS
(($141.80))$150.10
 
RESUBMITTAL FEE
(($76.70))$81.20
 
ADDENDUM (Approval expires on same date as original plan.)
(($76.70))$81.20
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.60))$5.90 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
DEPARTMENT AUDIT FEES:
 
 
AUDIT (per hour)*
(($76.70))$81.20
 
TRAVEL (per hour)*
(($76.70))$81.20
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION (per hour)*
(($76.70))$81.20
 
TRAVEL (per hour)*
(($76.70))$81.20
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
(($114.50))$121.20
INSIGNIA FEES:
 
 
STATE CERTIFIED
(($27.30))$28.90
 
ALTERATION
(($37.80))$40.00
 
REISSUED-LOST/DAMAGED
(($14.00))$14.80
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**)
(($76.70))$81.20
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
(($14.20))$15.00
REFUND FEE
(($27.30))$28.90
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.
OTS-2736.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150T-3000Factory-built temporary worker housing fees.
 
INITIAL FILING FEE
(($57.50))$60.80
 
DESIGN PLAN FEES:
 
 
 
INITIAL ONE YEAR DESIGN
(($166.80))$176.60
 
 
RENEWAL FEE
(($57.50))$60.80
 
 
RESUBMIT FEE
(($83.00))$87.90
 
 
ADDENDUM (Approval expires on same date as original plan)
(($83.00))$87.90
 
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.70))$6.00 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
 
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour*
(($98.40))$104.20
 
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
(($15.30))$16.20
 
DEPARTMENT INSPECTION FEES:
 
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
(($83.00))$87.90
 
 
TRAVEL (Per hour)*
(($83.00))$87.90
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
DEPARTMENT AUDIT FEES:
 
 
 
AUDIT (Per hour*)
(($83.00))$87.90
 
 
TRAVEL (Per hour*)
(($83.00))$87.90
 
 
PER DIEM**
 
 
 
HOTEL***
 
 
 
MILEAGE**
 
 
 
RENTAL CAR***
 
 
 
PARKING***
 
 
 
AIRFARE***
 
 
INSIGNIA FEES:
 
 
 
FIRST SECTION
(($234.00))$247.80
 
 
EACH ADDITIONAL SECTION
(($22.50))$23.80
 
 
REISSUED-LOST/DAMAGED
(($57.50))$60.80
 
ELECTRICAL COMMERCIAL/INDUSTRIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
(($242.40))$256.70
 
 
Additional Feeder
(($45.90))$48.60
 
ELECTRICAL MULTIFAMILY RESIDENTIAL
 
 
 
Electrical Service/feeders 200 Amperage plus
 
 
 
Service/feeder
(($128.50))$136.00
 
 
Additional Feeder
(($32.50))$34.40
 
OTHER FEES:
 
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
(($83.00))$87.90
 
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free per year)
(($15.30))$16.20
 
REFUND FEE
(($27.30))$28.90
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.
OTS-2737.1
AMENDATORY SECTION(Amending WSR 20-04-081, filed 2/4/20, effective 3/6/20)
WAC 296-150V-3000Conversion vendor units and medical units—Fees.
INITIAL FILING FEE
(($41.00))$43.40
DESIGN PLAN FEES:
 
 
INITIAL FEE - MASTER DESIGN
(($284.60))$301.40
 
INITIAL FEE - ONE YEAR DESIGN
(($116.30))$123.10
 
RENEWAL FEE
(($49.30))$52.20
 
RESUBMIT FEE
(($83.00))$87.90
 
ADDENDUM (Approval expires on same date as original plan)
(($83.00))$87.90
 
ELECTRONIC PLAN SUBMITTAL FEE (($5.70))$6.00 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section.
 
ELECTRICAL PLAN REVIEW - For medical units, find fees at http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
 
RECIPROCAL PLAN REVIEW:
 
 
INITIAL FEE - MASTER DESIGN
(($126.80))$134.20
 
INITIAL FEE - ONE YEAR DESIGN
(($76.60))$81.10
 
RENEWAL FEE
(($76.60))$81.10
 
ADDENDUM
(($76.60))$81.10
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS
(($15.30))$16.20
DEPARTMENT INSPECTION FEES:
 
 
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**)
(($83.00))$87.90
 
TRAVEL (Per hour)*
(($83.00))$87.90
 
PER DIEM**
 
 
HOTEL***
 
 
MILEAGE**
 
 
RENTAL CAR***
 
 
PARKING***
 
 
AIRFARE***
 
 
ALTERATION INSPECTION (One hour plus insignia alteration fee)
(($124.30))$131.60
INSIGNIA FEES:
 
 
FIRST SECTION/ALTERATION
(($23.80))$25.20
 
REISSUED-LOST/DAMAGED
(($15.30))$16.20
 
EXEMPT
(($41.00))$43.40
OTHER FEES:
 
 
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**)
(($83.00))$87.90
 
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
(($15.30))$16.20
REFUND FEE
(($27.30))$28.90
*
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
**
Per state guidelines.
***
Actual charges incurred.