WSR 26-02-054
PROPOSED RULES
DEPARTMENT OF
LABOR AND INDUSTRIES
[Filed January 6, 2026, 8:29 a.m.]
Original Notice.
Preproposal statement of inquiry was filed as WSR 21-13-140.
Title of Rule and Other Identifying Information: Trenching and excavation work plan; chapter 296-155 WAC, Safety standards for construction work.
Hearing Location(s): On February 10, 2026, at 1:30 p.m., at the Department of Labor and Industries (L&I), 12806 Gateway Drive South, Tukwila, WA 98168. A prehearing overview will begin at 1:00 p.m. The hearing will start at 1:30 p.m. and will continue until all oral comments are received;
On February 11, 2026, at 1:30 p.m., at the CenterPlace Event Center, 2426 North Discovery Place, Spokane Valley, WA 99216. A prehearing overview will begin at 1:00 p.m. The hearing will start at 1:30 p.m. and will continue until all oral comments are received; and
On February 12, 2026, at 1:30 p.m., via virtual and telephonic hearing. Join electronically at https://teams.microsoft.com/l/meetup-join/19%3ameeting_MGY0NTI3NDItY2IxZi00OTU2LTk5MjYtNTUzYjU4NGU2MmZm%40thread.v2/0?context=%7b%22Tid%22%3a%2211d0e217-264e-400a-8ba0-57dcc127d72d%22%2c%22Oid%22%3a%226b7fa266-e3f1-4839-be3b-aca564a9e50e%22%7d; or join by phone (audio only) 253-372-2181, Meeting ID 272 615 521 313 3, Passcode Z7ez7dU2. A prehearing overview will begin at 1:00 p.m. The hearing will start at 1:30 p.m. and will continue until all oral comments are received.
Date of Intended Adoption: March 17, 2026.
Submit Written Comments to: Carmyn Shute, Administrative Regulations Analyst, L&I, Division of Occupational Safety and Health (DOSH), P.O. Box 44620, Olympia, WA 98504-4620, email Carmyn.Shute@Lni.wa.gov, fax 360-902-5619, beginning January 7, 2026, 8:00 a.m., by February 20, 2026, 5:00 p.m.
Assistance for Persons with Disabilities: Contact Carmyn Shute, administrative regulations analyst, phone 360-870-6081, fax 360-902-5619, email Carmyn.Shute@Lni.wa.gov, by February 3, 2026.
Purpose of the Proposal and Its Anticipated Effects, Including Any Changes in Existing Rules: DOSH is proposing to amend WAC 296-155-655 General protection requirements, under chapter 296-155 WAC, Safety standards for construction work, Part N Excavation, trenching, and shoring, to require employers to complete a written work plan detailing appropriate risk analysis and prior to beginning any work that requires a protective system. Definitions applicable to the chapter were moved from WAC 296-155-650 to new WAC 296-155-652.
Despite the existing requirement for employers to "ensure prompt and safe removal of injured employees from elevated work locations, trenches and excavations prior to commencement of work," inspection data revealed multiple fatalities and numerous injuries related to excavation and trenching work in Washington. The conclusions of fatality investigations in recent years suggest that a better approach to risk analysis could serve greatly to reduce the likelihood of similar fatalities in the future.
Proposed amendments:
| |
| • | Add "work plan" to definitions. |
| • | Require a competent person to remain on site any time trenching and excavation work is being performed. |
| • | Require completion of a written work plan (provided on the L&I website) for any trench excavation that requires a protective system under WAC 296-154-657 (1)(a). Employers may also create their own work plan that meets the criteria outlined in the rule. |
| • | Address recordkeeping and training requirements of the work plan. |
Reasons Supporting Proposal: The proposed rule making will provide increased safety awareness and protections for workers in the trenching and excavation industry.
Statute Being Implemented: Chapter
49.17 RCW.
Rule is not necessitated by federal law, federal or state court decision.
Name of Proponent: L&I, governmental.
Name of Agency Personnel Responsible for Drafting: Thomas West, Tumwater, Washington, 509-237-2372; Implementation and Enforcement: Craig Blackwood, Tumwater, Washington, 360-902-5828.
A school district fiscal impact statement is not required under RCW
28A.305.135.
A cost-benefit analysis is required under RCW
34.05.328. A preliminary cost-benefit analysis may be obtained by contacting Carmyn Shute, Administrative Regulations Analyst, L&I, DOSH, P.O. Box 44620, Olympia, WA 98504-4620, phone 360-870-4525, fax 360-902-5619, email
Carmyn.Shute@Lni.wa.gov.
This rule proposal, or portions of the proposal, is exempt from requirements of the Regulatory Fairness Act because the proposal:
Is exempt under RCW
19.85.025(3) as the rules only correct typographical errors, make address or name changes, or clarify language of a rule without changing its effect.
Scope of exemption for rule proposal:
Is partially exempt:
Explanation of partial exemptions:
| Proposed WAC Sections and Title | This proposed rule section is not exempt. Analysis is required | This proposed rule section is exempt. Provide RCW to support this exemption. |
1 | WAC 296-155-650 Scope,and application, and definitions applicable toof this part. | □ | RCW 34.05.310 (4)(d); the proposed language is fully exempt, changes in this section are housekeeping or interpretive that clarifying without changing the intent of the rule and establish a definition that does not subject a person to a violation or penalty. |
2 | WAC 296-155-652 Definitions applicable to this part. | □ | RCW 34.05.310 (4)(d); the proposed language is fully exempt, changes in this section are housekeeping or interpretive that clarifying without changing the intent of the rule and establish a definition that does not subject a person to a violation or penalty. |
3 | WAC 296-155-655 General protection requirements. Subsections (13)(a) through (c). | X | |
4 | WAC 296-155-655 General protection requirements. Subsection (13)(d). | □ | RCW 34.05.310 (4)(c); the proposed language in subsection (13)(d) of this section would adopt requirements for employees as required under 29 C.F.R. 1926.21 (b)(2). |
The proposed rule does not impose more-than-minor costs on businesses. Following is a summary of the agency's analysis showing how costs were calculated. The proposed rule reiterates the requirement for a competent person to be available on site when trenching and excavation activities are taking place, and requires written documentation of analysis required under WAC 296-155-655 regarding protecting workers engaged in trenching and excavation activities. Employers are allowed to use a work plan developed by L&I or may create their own work plan that meets the criteria outlined in the rule. There is minimal to no cost of compliance with the rule, and any cost of compliance would be administrative in nature.
January 6, 2026
Joel Sacks
Director
RDS-6756.4
AMENDATORY SECTION(Amending WSR 16-09-085, filed 4/19/16, effective 5/20/16)
WAC 296-155-650Scope((,))and application((, and definitions applicable to))of this part.
(((1)))Scope and application. This part applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.
(((2) Definitions applicable to this part.
Accepted engineering requirements or practices. Those requirements which are compatible with standards of practice required by a registered professional engineer.
Aluminum hydraulic shoring. A preengineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins.
Bell-bottom pier hole. A type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape.
Benching (benching system). A method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels.
Cave-in. The separation of a mass of soil or rock material from the side of an excavation, or loss of soil from under a trench shield or support system, and its sudden movement into the excavation in quantity that it could entrap, bury, injure, or immobilize a person.
Competent person. One who can identify existing or predictable hazards in the surroundings that are unsanitary, hazardous, or dangerous to employees. Also has authorization or authority by the nature of their position to take prompt corrective measures to eliminate them. The person must be knowledgeable in the requirements of this part.
Cross braces. The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales.
Excavation. Any person-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal.
Faces or sides. The vertical or inclined earth surfaces formed as a result of excavation work.
Failure. The breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities.
Hazardous atmosphere. A atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury.
Kickouts. Accidental release or failure of a cross brace.
Protective system. A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
Ramp. An inclined walking or working surface that is used to gain access to one point to another, and is constructed from earth or from structural materials such as steel or wood.
Registered professional engineer. A person who is registered as a professional engineer in the state of Washington. The registered professional engineer must comply with the Washington state department of licensing requirements, chapter 18.43 RCW. Sheeting. The members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system.
Shield (shield system). A structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with WAC 296-155-657 (3)(c) or (d). Shields used in trenches are usually referred to as "trench boxes" or "trench shields."
Shoring (shoring system). A structure such as a metal hydraulic, mechanical, or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins.
Sides. See "faces."
Sloping (sloping system). A method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge loads.
Stable rock. A natural solid mineral material that can be excavated with vertical sides and will remain intact while exposed. Unstable rock is considered to be stable when the rock material on the side or sides of the excavation is secured against caving-in or movement by rock bolts or by another protective system that has been designed by a registered professional engineer.
Structural ramp. A ramp built of steel or wood, usually used for vehicle access. Ramps made of soil or rock are not considered structural ramps.
Support system. A structure such as underpinning, bracing or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation.
Tabulated data. Tables and charts approved by a registered professional engineer and used to design and construct a protective system.
Trench (trench excavation). A narrow excavation in relation to its length made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.
Trench box. See "shield."
Trench shield. See "shield."
Uprights. The vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called "sheeting."
Wales. Horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth.))
NEW SECTION
WAC 296-155-652Definitions applicable to this part.
(1) Accepted engineering requirements or practices. Those requirements which are compatible with standards of practice required by a registered professional engineer.
(2) Aluminum hydraulic shoring. A preengineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins.
(3) Bell-bottom pier hole. A type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape.
(4) Benching (benching system). A method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels.
(5) Cave-in. The separation of a mass of soil or rock material from the side of an excavation, or loss of soil from under a trench shield or support system, and its sudden movement into the excavation in quantity that it could entrap, bury, injure, or immobilize a person.
(6) Competent person. One who can identify existing or predictable hazards in the surroundings that are unsanitary, hazardous, or dangerous to employees. Also has authorization or authority by the nature of their position to take prompt corrective measures to eliminate them. The person must be knowledgeable in the requirements contained in this part.
(7) Cross braces. The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales.
(8) Excavation. Any person-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal.
(9) Faces or sides. The vertical or inclined earth surfaces formed as a result of excavation work.
(10) Failure. The breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities.
(11) Hazardous atmosphere. An atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury.
(12) Kickouts. Accidental release or failure of a cross brace.
(13) Protective system. A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
(14) Ramp. An inclined walking or working surface that is used to gain access to one point to another, and is constructed from earth or from structural materials such as steel or wood.
(15)
Registered professional engineer. A person who is registered as a professional engineer in the state of Washington. The registered professional engineer must comply with the Washington state department of licensing requirements, chapter
18.43 RCW.
(16) Sheeting. The members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system.
(17) Shield (shield system). A structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with WAC 296-155-657 (3)(c) or (d). Shields used in trenches are usually referred to as "trench boxes" or "trench shields."
(18) Shoring (shoring system). A structure such as a metal hydraulic, mechanical, or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins.
(19) Sides. See "faces."
(20) Sloping (sloping system). A method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge loads.
(21) Stable rock. A natural solid mineral material that can be excavated with vertical sides and will remain intact while exposed. Unstable rock is considered to be stable when the rock material on the side or sides of the excavation is secured against caving-in or movement by rock bolts or by another protective system that has been designed by a registered professional engineer.
(22) Structural ramp. A ramp built of steel or wood, usually used for vehicle access. Ramps made of soil or rock are not considered structural ramps.
(23) Support system. A structure such as underpinning, bracing or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation.
(24) Tabulated data. Tables and charts approved by a registered professional engineer and used to design and construct a protective system.
(25) Trench (trench excavation). A narrow excavation in relation to its length made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.
(26) Trench box. See "shield."
(27) Trench shield. See "shield."
(28) Uprights. The vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called "sheeting."
(29) Wales. Horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth.
(30) Work plan. A written planning document in which the employer identifies any trench excavation an employee may enter that is four feet or greater in depth, or when a protective system is required, regardless of depth. See WAC 296-155-655(13), Trench excavations, for requirements.
AMENDATORY SECTION(Amending WSR 22-15-089, filed 7/19/22, effective 8/19/22)
WAC 296-155-655General protection requirements.
(1) Surface encumbrances. You must remove or support surface encumbrances that are located so as to create a hazard to employees, as necessary, to safeguard employees.
(2) Underground installations.
(a) You must locate utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, prior to opening an excavation.
(b) You must contact utility companies or owners within established or customary local response times, advised of the proposed work, and asked to locate the underground utility installation prior to the start of actual excavation.
(c) When excavation operations approach the location of underground installations, you must determine the exact location of the installations by safe and acceptable means.
(d) While the excavation is open, you must protect underground installations, supported, or removed as necessary to safeguard employees.
(3) Access and egress.
(a) Structural ramps.
(i) Structural ramps that are used solely by employees as a means of access or egress from excavations must be designed by a competent person. Structural ramps used for access or egress of equipment must be designed by a competent person qualified in structural design, and must be constructed in accordance with the design.
(ii) Ramps and runways constructed of two or more structural members must have the structural members connected together to prevent displacement.
(iii) Structural members used for ramps and runways must be of uniform thickness.
(iv) Cleats or other appropriate means used to connect runway structural members must be attached to the bottom of the runway or must be attached in a manner to prevent tripping.
(v) Structural ramps used in lieu of steps must be provided with cleats or other surface treatments on the top surface to prevent slipping.
(b) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress must be located in trench excavations that are ((4))four feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees.
(4) Exposure to vehicular traffic. You must provide employees exposed to vehicular traffic with, and they must wear, high-visibility garments meeting the requirements of WAC 296-155-200, General requirements for personal protective equipment (PPE).
(5) Exposure to falling loads. You must not permit any employee underneath loads handled by lifting or digging equipment. You must require employees to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. Operators may remain in the cabs of vehicles being loaded or unloaded when the vehicles are equipped, in accordance with WAC 296-155-610 (2)(g), to provide adequate protection for the operator during loading and unloading operations.
(6) Warning system for mobile equipment. When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, you must utilize a warning system such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.
(7) Hazardous atmospheres.
(a) Testing and controls. In addition to the requirements set forth in parts B-1 and C of this chapter (296-155 WAC) and chapter 296-880 WAC to prevent exposure to harmful levels of atmospheric contaminants and to assure acceptable atmospheric conditions, the following requirements apply:
(i) Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, you must test the atmospheres in the excavation before employees enter excavations greater than ((4))four feet (1.22m) in depth.
(ii) You must take adequate precautions to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres. These precautions include providing proper respiratory protection or ventilation in accordance with chapter 296-842 WAC.
(iii) You must take adequate precaution such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 10 percent of the lower flammable limit of the gas.
(iv) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, you must conduct testing as often as necessary to ensure that the atmosphere remains safe.
(b) Emergency rescue equipment.
(i) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, must be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment must be attended when in use.
(ii) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, must wear a harness with a lifeline securely attached to it. The lifeline must be separate from any line used to handle materials, and must be individually attended at all times while the employee wearing the lifeline is in the excavation.
Note: | See chapter 296-62 WAC, Part M for additional requirements applicable to confined space operations. |
(8) Protection from hazards associated with water accumulation.
(a) Employees must not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline.
(b) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations must be monitored by a competent person to ensure proper operation.
(c) If excavation work interrupts the natural drainage of surface water (such as streams), you must use diversion ditches, dikes, or other suitable means to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Excavations subject to runoff from heavy rains will require an inspection by a competent person and compliance with ((subdivisions)) (a) and (b) of this subsection.
(9) Stability of adjacent structures.
(a) Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, you must provide support systems such as shoring, bracing, or underpinning to ensure the stability of such structures for the protection of employees.
(b) You must not permit excavation below the level of the base or footing of any foundation or retaining wall that could be reasonably expected to pose a hazard to employees except when:
(i) A support system, such as underpinning, is provided to ensure the safety of employees and the stability of the structure; or
(ii) The excavation is in stable rock; or
(iii) A registered professional engineer has approved the determination that the structure is sufficiently removed from the excavation so as to be unaffected by the excavation activity; or
(iv) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees.
(c) Sidewalks, pavements, and appurtenant structure must not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures.
(10) Protection of employees from loose rock or soil.
(a) You must provide adequate protection to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection must consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection.
(b) You must protect employees from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection must be provided by placing and keeping such materials or equipment at least two feet (.61m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.
(11) Inspections.
(a) Daily inspections of excavations, the adjacent areas, and protective systems must be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection must be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections must also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
(b) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, you must remove exposed employees from the hazardous area until the necessary precautions have been taken to ensure their safety.
(12) Fall protection.
(a) You must provide walkways where employees or equipment are required or permitted to cross over excavations. You must provide guardrails which comply with chapter 296-880 WAC, Unified safety standards for fall protection where walkways are ((4))four feet or more above lower levels.
(b) You must provide adequate barrier physical protection at all remotely located excavations. You must barricade or cover all wells, pits, shafts, etc. Upon completion of exploration and similar operations, you must backfill temporary wells, pits, shafts, etc.
(13) Trench excavations.
(a) A competent person must remain on-site any time trenching or excavation work is being performed.
(b) The employer must complete a written work plan for any trench excavation into which an employee may enter and where a protective system is required under WAC 296-155-657 (1)(a). A written work plan is not required when:
(i) The trench is four feet or less and a protective system is not required; or
(ii) When the trench excavations are sloped at an angle not steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal), provided that type C soil is assumed at the work site.
(c) The employer may use a work plan available on the department's website, or may develop a work plan that includes at minimum the following:
(i) Identify all trench excavations where a protective system is required;
(ii) Identify the classification of soil and rock deposits;
(iii) Identify underground installations;
(iv) Describe the method of protecting underground installations when the trench excavation is open;
(v) Describe the method of protection from surface encumbrances;
(vi) Describe the method of stabilizing adjacent structures;
(vii) Identify potentially hazardous atmospheres;
(viii) Describe the type of protective system to be provided;
(ix) Describe the procedure for the installation and removal of the protective system that protects employees from cave-ins, structural collapses, or from being struck by members of the protective system;
(x) Describe the frequency of inspections of trench excavations, the adjacent areas, and protective system for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions;
(xi) Describe the method of protection for employees from cave-ins when entering or exiting the areas protected by shields;
(xii) Describe the method of protecting workers in a trench excavation from loose soil, rock, or equipment that could pose a hazard by falling or rolling into the excavation;
(xiii) Describe the method of protection from hazards associated with water accumulation;
(xiv) Describe the safe means of egress from trench excavations;
(xv) Be available on-site for inspection by the department.
(d) Training. Prior to permitting employees into any trench excavation where a protective system is required, the employer must ensure employees are trained and instructed on the items described in (c)(i) through (xv) of this subsection.