5780 AAS 3/12/93
SB 5780 - S AMD
By Senators Sutherland, Nelson and Hochstatter
Adopted 3/12/93
On
page 1, line 12, after "pressure" insert "((and))"
On page 1, line 13, after "inspections" strike "and" and insert "if the contents, history, or operation of the power boiler or the material of which it is constructed warrant special consideration. Power boilers"
SB 5780 - S AMD
By Senators Sutherland, Nelson and Hochstatter
Adopted 3/12/93
On page 2, beginning on line 25, strike all of section 3
SB 5780 - S AMD
By Senators Sutherland, Nelson and Hochstatter
Adopted 3/12/93
On page 1, line 3 of the title, after "70.79.240" strike ",70.79.250, and 70.79.260" and insert "and 70.79.250"
SB 5780 - S Amd
BySenators Sutherland and Hochstatter
On page 2, line 23, strike
"((between inspections prescribed by the board))" and insert
"established by the bnoard under RCW 70.79.240(1)"
SB 5780 - S Comm Amd
ByCommittee on Energy and Utilities
Adopted 3/12/93
On page 2, line 17, after
"the" strike "((twelve months may)) period" and
insert "((twelve month)) period ((may))"
--- END ---