S-1643.1 _______________________________________________
SUBSTITUTE SENATE BILL 5671
_______________________________________________
State of Washington 53rd Legislature 1993 Regular Session
By Senate Committee on Natural Resources (originally sponsored by Senators Owen, Sutherland, Amondson, Erwin, Hargrove, Oke, L. Smith and Fraser)
Read first time 02/25/93.
AN ACT Relating to the definition of a substantial development and providing for hydraulics permit exemptions for routine repair and maintenance; and amending RCW 90.58.030 and 75.20.100.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW 90.58.030 and 1987 c 474 s 1 are each amended to read as follows:
As used in this chapter, unless the context otherwise requires, the following definitions and concepts apply:
(1) Administration:
(a) "Department" means the department of ecology;
(b) "Director" means the director of the department of ecology;
(c) "Local government" means ((any))
a county, incorporated city, or town ((which)) that
contains within its boundaries ((any)) lands or waters subject to this
chapter;
(d) "Person" means an individual, partnership, corporation, association, organization, cooperative, public or municipal corporation, or agency of the state or local governmental unit however designated;
(e) "Hearing board" means the shoreline hearings board established by this chapter.
(2) Geographical:
(a) "Extreme low tide" means the lowest line on the land reached by a receding tide;
(b) "Ordinary high water mark" on all
lakes, streams, and tidal water is that mark that will be found by examining
the bed and banks and ascertaining where the presence and action of waters are
so common and usual, and so long continued in all ordinary years, as to mark
upon the soil a character distinct from that of the abutting upland, in respect
to vegetation as that condition exists on June 1, 1971, as it may naturally
change thereafter, or as it may change thereafter in accordance with permits
issued by a local government or the department((: PROVIDED, That)).
In ((any)) an area where the ordinary high water mark cannot
be found, the ordinary high water mark adjoining salt water shall be the line
of mean higher high tide and the ordinary high water mark adjoining fresh water
shall be the line of mean high water;
(c) "Shorelines of the state" are the total of all "shorelines" and "shorelines of state-wide significance" within the state;
(d) "Shorelines" means all of the
water areas of the state, including reservoirs, and their associated wetlands,
together with the lands underlying them; except (i) shorelines of state-wide
significance; (ii) shorelines on segments of streams upstream of a point where
the mean annual flow is twenty cubic feet per second or less and the wetlands
associated with ((such)) the upstream segments; and (iii)
shorelines on lakes less than twenty acres in size and wetlands associated with
((such)) small lakes;
(e) "Shorelines of state-wide significance" means the following shorelines of the state:
(i) The area between the ordinary high water mark and the western boundary of the state from Cape Disappointment on the south to Cape Flattery on the north, including harbors, bays, estuaries, and inlets;
(ii) Those areas of Puget Sound and adjacent salt waters and the Strait of Juan de Fuca between the ordinary high water mark and the line of extreme low tide as follows:
(A) Nisqually Delta‑-from DeWolf Bight to Tatsolo Point,
(B) Birch Bay‑-from Point Whitehorn to Birch Point,
(C) Hood Canal‑-from Tala Point to Foulweather Bluff,
(D) Skagit Bay and adjacent area‑-from Brown Point to Yokeko Point, and
(E) Padilla Bay‑-from March Point to William Point;
(iii) Those areas of Puget Sound and the Strait of Juan de Fuca and adjacent salt waters north to the Canadian line and lying seaward from the line of extreme low tide;
(iv) Those lakes, whether natural, artificial, or a combination thereof, with a surface acreage of one thousand acres or more measured at the ordinary high water mark;
(v) Those natural rivers or segments thereof as follows:
(A) ((Any)) A west of the crest
of the Cascade range downstream of a point where the mean annual flow is
measured at one thousand cubic feet per second or more,
(B) ((Any)) An east of the crest
of the Cascade range downstream of a point where the annual flow is measured at
two hundred cubic feet per second or more, or those portions of rivers east of
the crest of the Cascade range downstream from the first three hundred square
miles of drainage area, whichever is longer;
(vi) Those wetlands associated with (i), (ii), (iv), and (v) of this subsection (2)(e);
(f) "Wetlands" or "wetland
areas" means those lands extending landward for two hundred feet in all
directions as measured on a horizontal plane from the ordinary high water mark;
floodways and contiguous floodplain areas landward two hundred feet from such
floodways; and all marshes, bogs, swamps, and river deltas associated with the
streams, lakes, and tidal waters which are subject to the provisions of this
chapter; the same to be designated as to location by the department of
ecology((: PROVIDED, That any)). A county or city may determine
that portion of a one-hundred-year-flood plain to be included in its master
program as long as ((such)) the portion includes, as a minimum,
the floodway and the adjacent land extending landward two hundred feet
therefrom;
(g) "Floodway" means those portions of the area of a river valley lying streamward from the outer limits of a watercourse upon which flood waters are carried during periods of flooding that occur with reasonable regularity, although not necessarily annually, said floodway being identified, under normal condition, by changes in surface soil conditions or changes in types or quality of vegetative ground cover condition. The floodway shall not include those lands that can reasonably be expected to be protected from flood waters by flood control devices maintained by or maintained under license from the federal government, the state, or a political subdivision of the state.
(3) Procedural terms:
(a) "Guidelines" means those
standards adopted to implement the policy of this chapter for regulation of use
of the shorelines of the state prior to adoption of master programs. ((Such))
The standards shall also provide criteria to local governments and the
department in developing master programs;
(b) "Master program" ((shall mean))
means the comprehensive use plan for a described area, and the use
regulations together with maps, diagrams, charts, or other descriptive material
and text, a statement of desired goals, and standards developed in accordance
with the policies enunciated in RCW 90.58.020;
(c) "State master program" is the cumulative total of all master programs approved or adopted by the department of ecology;
(d) "Development" means a use
consisting of the construction or exterior alteration of structures; dredging;
drilling; dumping; filling; removal of any sand, gravel, or minerals;
bulkheading; driving of piling; placing of obstructions; or ((any)) a
project of a permanent or temporary nature which interferes with the normal
public use of the surface of the waters overlying lands subject to this chapter
at any state of water level;
(e) "Substantial development" ((shall
mean any)) means a development of which the total cost or fair market
value exceeds ((two)) eight thousand five hundred dollars, to
be reviewed and reported to the legislature every five years beginning
September 1998 by the department of ecology for possible increases due to
inflation, or ((any)) a development ((which)) that
materially interferes with the normal public use of the water or shorelines of
the state; except that the following shall not be considered substantial
developments for the purpose of this chapter:
(i) Normal maintenance or repair of existing structures or developments, including damage by accident, fire, or elements;
(ii) Construction of the normal protective bulkhead common to single family residences;
(iii) Emergency construction necessary to protect property from damage by the elements;
(iv) Construction and practices normal or
necessary for farming, irrigation, and ranching activities, including
agricultural service roads and utilities on wetlands, and the construction and
maintenance of irrigation structures including but not limited to head gates,
pumping facilities, and irrigation channels((: PROVIDED, That)). A
feedlot of any size, all processing plants, other activities of a commercial
nature, alteration of the contour of the wetlands by leveling or filling other
than that which results from normal cultivation, shall not be considered normal
or necessary farming or ranching activities. A feedlot shall be an enclosure
or facility used or capable of being used for feeding livestock hay, grain,
silage, or other livestock feed, but shall not include land for growing crops
or vegetation for either livestock feeding ((and/or)) or
grazing, or both nor shall it include normal livestock wintering
operations;
(v) Construction or modification of navigational aids such as channel markers and anchor buoys;
(vi) Construction on wetlands by an owner,
lessee, or contract purchaser of a single family residence for his own use or
for the use of his family, which residence does not exceed a height of
thirty-five feet above average grade level and ((which)) that
meets all requirements of the state agency or local government having
jurisdiction thereof, other than requirements imposed pursuant to this chapter;
(vii) Construction of a dock, including a
community dock, designed for pleasure craft only, for the private noncommercial
use of the owner, lessee, or contract purchaser of single and multiple family
residences, the cost of which does not exceed ((two)) eight
thousand five hundred dollars to be reviewed and reported to the legislature
every five years beginning September 1998 by the department of ecology for
possible increases due to inflation;
(viii) Operation, maintenance, or construction of canals, waterways, drains, reservoirs, or other facilities that now exist or are hereafter created or developed as a part of an irrigation system for the primary purpose of making use of system waters, including return flow and artificially stored ground water for the irrigation of lands;
(ix) The marking of property lines or corners
on state owned lands, when ((such)) the marking does not
significantly interfere with normal public use of the surface of the water;
(x) Operation and maintenance of ((any))
a system of dikes, ditches, drains, or other facilities existing on
September 8, 1975, ((which)) that were created, developed, or
utilized primarily as a part of an agricultural drainage or diking system;
(xi) ((Any)) An action commenced
prior to December 31, 1982, pertaining to (A) the restoration of interim
transportation services as may be necessary as a consequence of the destruction
of the Hood Canal bridge, including, but not limited to, improvements to
highways, development of park and ride facilities, and development of ferry
terminal facilities until a new or reconstructed Hood Canal bridge is open to
traffic; and (B) the reconstruction of a permanent bridge at the site of the
original Hood Canal bridge.
Sec. 2. RCW 75.20.100 and 1991 c 322 s 30 are each amended to read as follows:
In the event that any person or government agency desires to construct any form of hydraulic project or perform other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state, such person or government agency shall, before commencing construction or work thereon and to ensure the proper protection of fish life, secure the written approval of the department of fisheries or the department of wildlife as to the adequacy of the means proposed for the protection of fish life. This approval shall not be unreasonably withheld. Except as provided in RCW 75.20.1001 and 75.20.1002, the department of fisheries or the department of wildlife shall grant or deny approval within forty-five calendar days of the receipt of a complete application and notice of compliance with any applicable requirements of the state environmental policy act, made in the manner prescribed in this section. The applicant may document receipt of application by filing in person or by registered mail. A complete application for approval shall contain general plans for the overall project, complete plans and specifications of the proposed construction or work within the mean higher high water line in salt water or within the ordinary high water line in fresh water, and complete plans and specifications for the proper protection of fish life. The forty-five day requirement shall be suspended if (1) after ten working days of receipt of the application, the applicant remains unavailable or unable to arrange for a timely field evaluation of the proposed project; (2) the site is physically inaccessible for inspection; or (3) the applicant requests delay. Immediately upon determination that the forty-five day period is suspended, the department of fisheries or the department of wildlife shall notify the applicant in writing of the reasons for the delay. Approval is valid for a period of up to five years from date of issuance. The permittee must demonstrate substantial progress on construction of that portion of the project relating to the approval within two years of the date of issuance. If either the department of fisheries or the department of wildlife denies approval, that department shall provide the applicant, in writing, a statement of the specific reasons why and how the proposed project would adversely affect fish life. Protection of fish life shall be the only ground upon which approval may be denied or conditioned. Chapter 34.05 RCW applies to any denial of project approval, conditional approval, or requirements for project modification upon which approval may be contingent. If any person or government agency commences construction on any hydraulic works or projects subject to this section without first having obtained written approval of the department of fisheries or the department of wildlife as to the adequacy of the means proposed for the protection of fish life, or if any person or government agency fails to follow or carry out any of the requirements or conditions as are made a part of such approval, the person or director of the agency is guilty of a gross misdemeanor. If any such person or government agency is convicted of violating any of the provisions of this section and continues construction on any such works or projects without fully complying with the provisions hereof, such works or projects are hereby declared a public nuisance and shall be subject to abatement as such.
For the purposes of this section and RCW 75.20.103, "bed" shall mean the land below the ordinary high water lines of state waters. This definition shall not include irrigation ditches, canals, storm water run-off devices, or other artificial watercourses except where they exist in a natural watercourse that has been altered by man.
The phrase "to construct any form of hydraulic project or perform other work" shall not include the act of driving across an established ford. Driving across streams or on wetted stream beds at areas other than established fords requires approval. Work within the ordinary high water line of state waters to construct or repair a ford or crossing requires approval.
For each application, the department of fisheries and the department of wildlife shall mutually agree on whether the department of fisheries or the department of wildlife shall administer the provisions of this section, in order to avoid duplication of effort. The department designated to act shall cooperate with the other department in order to protect all species of fish life found at the project site. If the department of fisheries or the department of wildlife receives an application concerning a site not in its jurisdiction, it shall transmit the application to the other department within three days and notify the applicant.
In case of an emergency arising from weather or stream flow conditions or other natural conditions, the department of fisheries or department of wildlife, through their authorized representatives, shall issue immediately upon request oral approval for removing any obstructions, repairing existing structures, restoring stream banks, or to protect property threatened by the stream or a change in the stream flow without the necessity of obtaining a written approval prior to commencing work. Conditions of an oral approval shall be reduced to writing within thirty days and complied with as provided for in this section. Oral approval shall be granted immediately upon request, for a stream crossing during an emergency situation.
This section shall not apply to routine repair and maintenance work on projects that have previously been granted a hydraulics permit. If a hydraulics permit was previously granted all conditions under the permit must be followed in the routine repair and maintenance work. If a hydraulics permit was not previously obtained or granted for the project this section will still apply.
This section shall not apply to the construction of any form of hydraulic project or other work which diverts water for agricultural irrigation or stock watering purposes authorized under or recognized as being valid by the state's water codes, or when such hydraulic project or other work is associated with streambank stabilization to protect farm and agricultural land as defined in RCW 84.34.020. These irrigation or stock watering diversion and streambank stabilization projects shall be governed by RCW 75.20.103.
--- END ---