H-1656.1 _______________________________________________
HOUSE BILL 1963
_______________________________________________
State of Washington 56th Legislature 1999 Regular Session
By Representatives Koster, Dunshee, O'Brien, Anderson, G. Chandler, Sump, Dunn, B. Chandler and Mulliken
Read first time 02/12/1999. Referred to Committee on Local Government.
AN ACT Relating to flood plain management; and amending RCW 86.16.041.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW 86.16.041 and 1989 c 64 s 4 are each amended to read as follows:
(1) Beginning July 26, 1987, every county and incorporated city and town shall submit to the department of ecology any new flood plain management ordinance or amendment to any existing flood plain management ordinance. Such ordinance or amendment shall take effect thirty days from filing with the department unless the department disapproves such ordinance or amendment within that time period.
(2) The department may disapprove any ordinance or amendment submitted to it under subsection (1) of this section if it finds that an ordinance or amendment does not comply with any of the following:
(a) Restriction of land uses within designated floodways including the prohibition of construction or reconstruction of residential structures except for: (i) Repairs, reconstruction, or improvements to a structure which do not increase the ground floor area; and (ii) repairs, reconstruction, or improvements to a structure the cost of which does not exceed fifty percent of the market value of the structure either, (A) before the repair, reconstruction, or repair is started, or (B) if the structure has been damaged, and is being restored, before the damage occurred. Work done on structures to comply with existing health, sanitary, or safety codes or to structures identified as historic places shall not be included in the fifty percent determination. However, the floodway prohibition in this subsection does not apply to existing farmhouses in designated floodways that meet the provisions of subsection (3) of this section. For the purposes of this section, "farmhouse" means a single family dwelling necessary to the operation of a commercial farm engaged in agriculture where the occupants of the dwelling derive their principal livelihood from the farm site upon which the farmhouse is located;
(b) The minimum requirements of the national flood insurance program; and
(c) The minimum state requirements adopted pursuant to RCW 86.16.031(8) that are applicable to the particular county, city, or town.
(3) Repairs, reconstruction, replacement, or improvements to existing farmhouse structures located in designated floodways and which are located on lands designated as agricultural lands of long-term commercial significance under RCW 36.70A.170 as identified by a particular county, city, or town's growth management act comprehensive plan shall be permitted subject to the following:
(a) The new farmhouse is a replacement for an existing farmhouse on the same farm site;
(b) There is no potential building site for a replacement farmhouse on the same farm outside the designated floodway;
(c) Repairs, reconstruction, or improvements to a farmhouse shall not increase the total square footage of encroachment of the existing farmhouse;
(d) A replacement farmhouse shall not exceed the total square footage of encroachment of the structure it is replacing;
(e) A farmhouse being replaced shall be removed, in its entirety, including foundation, from the floodway within ninety days after occupancy of a new farmhouse;
(f) For substantial improvements, and replacement farmhouses, the elevation of the lowest floor of the improvement and farmhouse respectively, including basement, is one foot higher than the base flood elevation;
(g) New and replacement water supply systems are designed to eliminate or minimize infiltration of flood waters into the system;
(h) New and replacement sanitary sewerage systems are designed and located to eliminate or minimize infiltration of flood water into the system and discharge from the system into the flood waters; and
(i) All other utilities and connections to public utilities are designed, constructed, and located to eliminate or minimize flood damage.
--- END ---