CERTIFICATION OF ENROLLMENT

 

                   SUBSTITUTE HOUSE BILL 2644

 

 

 

 

                        56th Legislature

                      2000 Regular Session

 

Passed by the House March 6, 2000

  Yeas 97   Nays 0

 

 

 

Speaker of the House of Representatives

     

 

 

Speaker of the House of Representatives

 

 

 

 

Passed by the Senate February 29, 2000

  Yeas 43   Nays 1

             CERTIFICATE

 

We, Timothy A. Martin and Cynthia Zehnder, Co-Chief Clerks of the House of Representatives of the State of Washington, do hereby certify that the attached is SUBSTITUTE HOUSE BILL 2644  as passed by the House of Representatives and the Senate on the dates hereon set forth.

 

 

 

                          Chief Clerk

 

 

 

                          Chief Clerk

President of the Senate

 

 

 

Approved Place Style On Codes above, and Style Off Codes below.           

                                FILED

                

 

Governor of the State of Washington

                   Secretary of State

                  State of Washington


          _______________________________________________

 

                    SUBSTITUTE HOUSE BILL 2644

          _______________________________________________

 

             Passed Legislature - 2000 Regular Session

 

                     AS AMENDED BY THE SENATE

 

State of Washington      56th Legislature     2000 Regular Session

 

By House Committee on Agriculture & Ecology (originally sponsored by Representatives Delvin, Grant, Hankins, Linville and G. Chandler)

 

Read first time 02/03/2000.  Referred to Committee on .

Restoring unfinished nuclear power sites.  


    AN ACT Relating to the restoration and redevelopment of unfinished nuclear power project sites for purposes of economic development, providing for sufficient water supply for restoration and redevelopment of such sites; and amending RCW 80.50.300.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

 

    Sec. 1.  RCW 80.50.300 and 1996 c 4 s 2 are each amended to read as follows:

    (1) This section applies only to unfinished nuclear power projects ((that are not located on federal property)).  If a certificate holder stops construction of a nuclear energy facility before completion, terminates the project or otherwise resolves not to complete construction, never introduces or stores fuel for the energy facility on the site, and never operates the energy facility as designed to produce energy, the certificate holder may contract, establish interlocal agreements, or use other formal means to effect the transfer of site restoration responsibilities, which may include economic development activities, to any political subdivision or subdivisions of the state composed of elected officials.  The contracts, interlocal agreements, or other formal means of cooperation may include, but are not limited to provisions effecting the transfer or conveyance of interests in the site and energy facilities from the certificate holder to other political subdivisions of the state, including costs of maintenance and security, capital improvements, and demolition and salvage of the unused energy facilities and infrastructure.

    (2) If a certificate holder transfers all or a portion of the site to a political subdivision or subdivisions of the state composed of elected officials and located in the same county as the site, the council shall amend the site certification agreement to release those portions of the site ((that are transferred pursuant to this section)) that it finds are no longer intended for the development of an energy facility.

    Immediately upon release of all or a portion of the site pursuant to this section, all responsibilities for maintaining the public welfare for portions of the site transferred, including but not limited to health and safety, are transferred to the political subdivision or subdivisions of the state.  For sites located on federal land, all responsibilities for maintaining the public welfare for all of the site, including but not limited to health and safety, must be transferred to the political subdivision or subdivisions of the state irrespective of whether all or a portion of the site is released.

    (3) The legislature finds that for all or a portion of sites that have been transferred to a political subdivision or subdivisions of the state prior to September 1, 1999, ensuring water for site restoration including economic development, completed pursuant to this section can best be accomplished by a transfer of existing surface water rights, and that such a transfer is best accomplished administratively through procedures set forth in existing statutes and rules.  However, if a transfer of water rights is not possible, the department of ecology shall, within six months of the transfer of the site or portion thereof pursuant to subsection (1) of this section, create a trust water right under chapter 90.42 RCW containing between ten and twenty cubic feet per second for the benefit of the appropriate political subdivision or subdivisions of the state.  The trust water right shall be used in fulfilling site restoration responsibilities, including economic development.  The trust water right shall be from existing valid water rights within the basin where the site is located.

    (4) For purposes of this section, "political subdivision or subdivisions of the state" means a city, town, county, public utility district, port district, or joint operating agency.

 


                            --- END ---